Florida Water Resources Journal - July 2022

Page 58

Aging Well- Protecting Our Infrastructure

2022 Water Distribution System Awards

Divisions based on the Number of Water Services Division 1 = 1 - 5,999 Division 2 = 6,000 - 12,999 Division 3 = 13,000 - 19,999

The FSAWWA Water Distribution System Awards are presented to utilities whose outstanding performance during the preceding year deserves special recognition by the section.

Division 4 = 20,000 - 29,999

The Award Criteria is based upon the following:

Division 7 = 70,000 - 129,999

Water Quality Operational Records Maintenance Professionalism Safety Emergency Prepardness Cross Connection Control Program Must be an AWWA member (Organizational or Individual) Actively supports the activities of the FSAWWA Demonstrates high standards and integrity The selection committee is under the Manufacturers/Associates Council.

Division 8 = 130,000+

• • •

Division 6 = 46,000 - 69,999

Send applications to: Mike George 10482 Dunkirk Road Spring Hill, FL 34608 tapitflorida@att.net

Deadline

2021 Winners: Division 1: Division 2: Division 3: Division 4: Division 5: Division 6: Division 7: Division 8:

Division 5 = 30,000 - 45,999

Not Awarded South Walton Utility Co., Inc. City of Zephyrhills Utility Department Bonita Springs Utilities, Inc. City of Boca Raton Utility Services Department Broward County Water and Wastewater Services Lee County Utilities Water Distribution Hillsborough County Public Utilities Department

Friday, October 21, 2022 Download the application form:

www.fsawwa.org/ distributionawards

E W Looking forward to seeing you at the Hyatt Regency Grand Cypress on November 27 to November 30, 2022.

58 July 2022 • Florida Water Resources Journal

Thank you for your interest in the FSAWWA.


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Display Advertiser Index

4min
pages 86-88

TREEO Center Training

2min
pages 79-80

News Beat

3min
pages 81-82

What is the Operators’ Initiative and Why is it

1min
page 76

FWEA Chapter Corner: South Chapter Meeting: Miami-Dade Water and Sewer Department Builds for the Future—Melody

2min
pages 70-71

C Factor—Patrick “Murf” Murphy

8min
pages 68-69

FSAWWA Speaking Out—Emilie Moore

4min
pages 72-74

Three Ion Exchange Technologies, One Tough Decision for Florida Utilities—Tyler Smith, Chris

18min
pages 62-67

Reader Profile— Felicity Appel

3min
page 61

Let’s Talk Safety: Jackhammer Safety

2min
page 60

FSAWWA 2022 Water Distribution System Awards

1min
page 58

Test Yourself—Donna Kaluzniak

3min
pages 54-55

In Memoriam: William Palan Allman

4min
page 49

Stormwater Management Planning: Does it

8min
pages 50-53

Emerging Renewal Technologies for Pressurized Pipelines—Steve Soldati

11min
pages 44-48

Students and Young Professionals Activities

2min
pages 28-29

Competitions

7min
pages 30-33

Operators Showcase

11min
pages 22-25

Women of Water Forum

7min
pages 26-27

Facility Tour

1min
page 19

Workshops and Technical Sessions

1min
page 21

CEU Challenge

4min
pages 8-9

Conference Highlights—Mish Clark

12min
pages 14-18

Exhibition

0
page 20

Addressing Per- and Poly-Fluoroalkyl Substances Through Source Water Assessments and Advanced Treatment Using Powdered Activated Carbon, Granular Activated Carbon, and Ion Exchange—

12min
pages 10-13

FWEA Focus—Sondra W. Lee

3min
pages 6-7

Fish Passage Program to Receive Federal Funding

3min
pages 4-5
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.