Projects with a value between R50 million and R250 milion

Design and Construction of the Emoyeni Reservoir by Knight Piésold for eThekwini Municipality

COMMENDATION

T

he design and construction

movement joints in the structure. As this

of the Emoyeni Reservoir

was a very large concrete structure

was unique in that several

(100 m x 35 m x 8 m), the removal of

aspects in both areas

movement joints required careful modelling.

deviated from previous designs and

Furthermore, the previously utilised tapered

construction techniques.

wall width was changed to uniform walls.

Traditional structures incorporate several

The modelling of the structure showed

PROJECT TEAM Client: eThekwini Municipality Consulting Engineer: Knight Piésold Consulting Contractor: Afrostructures Occupational Health & Safety: Engelbrecht and Associates

movement joints to allow for movement

that the uniform walls performed better

and shrinkage of the concrete while still

as a propped cantilever with smaller crack

maintaining water-tightness. The client

width, and made the reinforcing designs at

This large structure was constructed in the

(eThekwini Municipality) had used this

the corners simpler and easier to construct.

heart of a high-income residential suburb

concept design for most of the existing

Construction joints were still required;

with very little working space and with

reservoirs in and around the Durban area.

however, the specification on these was

cognisance of issues such as noise

The problem with these designs is that they

given careful consideration and was closely

pollution, dust pollution and traffic

relied on the construction of the joints and

monitored during construction. Although

congestion. Furthermore, the existing

specifically the water bars to be undertaken

the steel quantity increased in order to

water storage system that was on-site

correctly. Any errors or movement of the

mitigate cracking, this cost was offset

needed to be operational throughout the

water bars during the concrete pours result

against the savings in water bars, as well

contract duration.

in the water-tightness being compromised.

as the decrease in construction duration

This has resulted in many of the existing

and the lower risk of leakage. These design

utilised on the walls was to pour the 8 m

reservoir developing leaks.

changes resulted in a structure that was

high walls in a single lift. This was done to

commissioned with zero leaks and a high

reduce the number of construction joints, as

quality of concrete.

well as the construction duration.

For this design, Knight Piésold decided on a different approach, doing away with the

12 C E S A A o n E n g i n e e r i n g E x c e l l e n c e Aw a r d s 2 0 2 1

One of the unique construction techniques


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Daveng Consulting Engineers

1min
page 26

Edward Archer | SMEC South Africa

2min
page 27

Bigen Group

2min
page 24

Koleko

1min
page 25

Amal Doorgapershad | Knight Piésold

2min
page 28

Xolani Mandidi | AECOM

1min
page 32

AECOM

2min
page 29

Koleko

1min
page 30

Knight Piésold

2min
page 23

BVi Consulting Engineers

1min
page 22

Kuils River Upgrade by Zutari for City of Cape Town, Western Cape

2min
page 18

Construction of Mgcobaneni Bus Route and Culvert by Nathoo Mbenyane Engineers for the City of Mbombela, Mpumalanga

2min
page 19

Engineering 4.0 Building by Spoormaker & Partners for the University of Pretoria, Tshwane

2min
page 20

Plankenbrug Main Outfall Sewer and Associated Works - Phases 2 & 3 by AECOM for Stellenbosch Municipality, Western Cape

2min
page 17

Xhora Off-channel Dam Project by Hatch for Amathole District Municipality, Eastern Cape

2min
pages 15-16

Design and Construction of the Emoyeni Reservoir by Knight Piésold for eThekwini Municipality, KwaZulu-Natal

2min
page 14

Vopak Terminal Lesedi Admin Building by Zutari for Vopak South Africa Developments in Joint Venture with Royal Vopak and Reatile Resources, Gauteng

2min
page 21

The UCL 175 TCH Factory Expansion Project by Bosch Projects for UCL Company, KwaZulu-Natal

2min
page 12

The Leonardo by RMCE for Legacy Group, Sandton, Gauteng

2min
page 8

16 on Bree by Zutari for FWJK Developments, Cape Town

1min
page 9

Upgrading of National Route 7, Section 1 between Atlantis South and Kalbaskraal by AECOM for SANRAL, Western Cape

1min
page 10

Trans African Concessions (TRAC

2min
page 7

Dr PD (Dempsey) Naidoo

2min
page 6

Mareesburg Tailings Storage Facility (Phase 2) by SRK Consulting for Anglo American Platinum, Limpopo

1min
page 11

Aon: An opportunity to build a ‘new better’

2min
page 5

CESA: Making engineering future-proof

2min
page 4
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.