Mo portfolio

Page 1

// PORTFOLIO



CONTENTS PROFESSIONAL 50 Palace Gardens Terrace / London .01 11 Upper Belgrave Street / London .02

Private House / Lisbon .03 New civic center Woodside House, Haringey / London .04 Hilton Lagos Hotel / Nigeria .05 Private House, Leria / Portugal .06 Residential Bulding, Azinhaga das Galhardas / Lisbon .07 Residential Bulding, Portas do Tejo, Park Expo / Lisbon .08 Residential Bulding, Luna Mar e Luna Rio, Park Expo / Lisbon .09 Açoreana Office / Lisbon .10 Residential Building, Rua Luis Padre Aparício / Lisbon .11 Private House, Rua S. Joaquim / Lisbon .12 Renovation of Crato Castel .13 COMPETITIONS King´s X Square, International Design Competition / London .14 International urban competion, Poço do Bispo / Lisbon .15 ACADEMIC Av. 24 Julho, Hotel / Lisbon .16 4 heads Art Galery, Setubal / Portugal .17 Urban Intervation and Library, Milan/ Italy .18 Urban intervation, River Walking passage, Park Expo/ Lisbon .19

GRAPHIC Sketches .20 Graphic Design, Business Cards .21 About ME

Margarida Oliveira // PORTFOLIO. [margarida.s.s.oliveira@gmail.com // +44 (0)7593727628 // +351 968995024]


50 PALACE GARDENS TERRACE / LONDON

T36

T37

315

315

315

315

T38

T39

T40

315

315

315

T41

T42

315

T43

580 650* RAD.

315

T44

T45

FML47c

197 300*

T35

20 mm (GAP BETWEEN STONE &WAll)

315

315

315

99 mm (GAP BETWEEN STONE &WAll)

50 mm (GAP BETWEEN STONE &WAll)

YEAR/Status: 2016 // Design Intent Approval & Construction and Cutting list // Status: ON-Going PROGRAM: Design, Supply and Stone installation OFFICE: EDM, LONDON TEAM: Margarida Oliveira, Design coordinator + Mathieu Fabre, Project Manager MY COMPETENCE: Drafting and checking all stages of Drawings, coordinating and managing in-house and overseas-based drafters from design to detailing/construction stage. Responsible for stone design and coordination with various interior trades for bathrooms, kitchens, communal areas and main staircase and the secondary staircase. CliENT: Private Budget: £1.3M

ST-07.H

T46

315

1139 1200*

T47

ST-07.H

1218 Finish

1198

1279

1213

1213

1079

1354

1145

948 (LIGHT FIXTURE)

LIFT BY OTHERS

FML47

ST-07.H

LIGHT FITTING TYPE B

1246 1300*

T34

20 mm(GAP BETWEEN STONE & LIFT) 07 425

62

ALIGNED

MID-LANDING FLOOR LEVEL

EQ. EQ.

EQ.

39

EQ.

39

810 (LIGHT FIXTURE)

929

1ST FLOOR LEVEL RISE 56

897 (LIGHT FIXTURE)

1236 1300*

50mm (GAP BETWEEN STONE & WAll) 1236

897 (LIGHT FIXTURE)

1020

1207

1086

VERTICAL HANDRAIL ON MID-LINE OF TREAD AS PER PTP DESIGN INTENT

ST-07.H

T47a

FML47a

62

LIGHT FITTING ACCORDANTELY WITH DOC. 50PGT_SK001_09.08.2016 ST-04.P T54

315

315

PLAN VIEW OF STAIR 3 - GROUND TO 1ST FLOOR

PL

SCALE 1:10

T53 315

T52 315

T51

T50

315

T49

T48

315

315

315

315

1132 1200*

ST-07.H FML47b

189 300*

315

T55

99 mm (GAP BETWEEN STONE &WAll)

T56

RAD.

573 650*

Ø 90

60

7

CL OF TREAD R

39

3

R3

R3

67

90

6 51

90

90

39

INTERNAL

3

VARIES

1

3

Varies

62

R

3 11

R

3

Varies

67

39

VARIES

LONGITUDINAL SECTION - THROUGH LIGHT

02

R3

SCALE 1:2

R

ADHESIVE - BY EDM

17

TRANSVER

4

R3

90

5 51

70

60 66

2

12

90

2

5 19

39

20

12

3

Varies

R

3

3

3

R

VARIES VARIES

158

70

90

01

SCALE 1:10 LONGITUDINAL SECTION - THROUGH STRUCTURE

CL OF TREAD

3

79

R 70

3 76

70

TR

1

5

02 000

R

158

90

3

3

51

166

315

79

R

3

175

159

01 000

3

3 76

3

3

TR

6

15

90

6

07 002

06 000

03 000

05 000

45

R3

158

45

MARBLE TREAD(TOP SIDE) - TREADS SCALE 1:10

79

3

PL

R

01.

1 17

7

60

1 187

TRANSVER


30

T61

0

SB39

300

T60

SB38 245 77

9

684 800*

T58

985 Finish

SB40

985 Finish

T59

77 90 9 0*

T57

474

90

90

90

90 55

SB24

1032 1100*

SB23

1032

SB22 1032

SB21 300

90

STONE SIZES

DIMENSION TO

CALACATTA COLORADO - HONED

ST-04.P

20MM BIANCO P- POLISHED FINIS

NOTES SURVEY

19-07-2017

SUR

1. DO NOT SCALE FROM DRAWINGS 2. SITE DIMENSIONS TO BE VERIFIE 3. REPORT ALL DISCREPANCIES TO 4. READ IN CONJUNCTION TO ALL R 5. EDM LONDON LTD ALL RIGHTS R

REFERENCE DRAWINGS DATE 2017.02.08

DRAWING NUMBE 43948 PGT Constru

2016.08.09

50PGT_SK001_09.

90

PROJECT

916 Finish

315

50 PGT 50, Pal W8 4R London

SB20

615 800*

55

ALL JOIN

ST-07.H

315

T35

TITLE

Main Stair Ground up

GROUND FLOOR LEVEL FFL +29.565

90

GROUND FLOOR LEVEL FFL +29.565

DETAIL -

300

1

T38

90

916 Finish

T34

929

03 425

1354

T36

SB26

90

916 Finish

90 948 (LIGHT FIXTURE)

SLIDING DOOR BY OTHERS

315

300 599 800*

90

20 mm(GAP BETWEEN STONE & LIFT)

315

55

90

TD4 429

SB25 300

T37

TD7

T34

315

01 002

17

90

474 300

LIFT BY OTHERS

T39

INDICATES S

SECTION LIN

QUERY

90

315 T40

INDICATES S

A 002

SPECIFICATION

315

SB27

TD3 428

90

T35

T41

0

DIRECTION O

*

615 800*

39

300 300

90 4239 FFL GROUND TO FFL FIRST FLOOR

90 90 1079

T37

T42

279

90 39

ISSUED FO LEGEND

315

98

10

30

90

T36

1079

315

55

55

315 T43

SB28

60 T38

T44

WALL FINISH BY OTHERS

90

T39

315

SB29

CL OF TREAD

39

1079

50 mm (GAP BETWEEN STONE &WAll) MID-LANDING LEVEL FML47 FFL 1139 +29.382 1200*

T47

315

90

T40

T48 315

T46

T45

39

1213 T41

SB33

T49 315

TD5 430

90

T42

WALL FINISH BY OTHERS

SB34 942 Finish

90

90

184 Finish

90 90

184 Finish

184 Finish

184 Finish

184 Finish

184 Finish

184 Finish

39

1213 T43

184 Finish

184 Finish

T44

184 Finish

184 Finish

T45

90

184 Finish

1279

184 Finish

99 mm (GAP BETWEEN STONE &RECESS)

10

98 10 00* 12

SB30

SB32

245

98

T50 315

260

1 T46

SB31

MID-LANDING LEVEL FFL +32.146

1425 1500*

FML47a

SB35

0

30

T51 315

2581 FFL GROUND TO FFL OF MID-LANDING

1443 1500*

FML47

100 mm (GAP BETWEEN STONE & WAll)

90

90

T48

0

90

90

T49

184 Finish

1020

1086

CL OF TREAD

279 30 T52 315

90

39

CL OF TREAD

SB36

90

T50

90

942 Finish

FACE OF WALL TO TAPESTRY RECESS

9

T53 315

90

90

T51

77

T54 315

90

90

T52

T55 315

90

1020

SB37

315

90

39

184 Finish

T53

184 Finish

90

T54

90

90

T55

184 Finish

1020

184 Finish

39

184 Finish

1020

T56

184 Finish

39

FRIST FLOOR LEVEL FFL +33.804

641 800*

FRIST FLOOR LEVEL FFL +33.804

FML56

LIGHT RECESS (2155mm)

MID-LANDING LEVEL FFL +29.382

MID-LANDING LEVEL FFL +29.382 06 425

260

1, Warre Tel: +44 (0) 207 8 ww

CL OF TREAD

SUB CONTRACTOR

EDM LONDON

ELEVATION OF STAIR 3 - GROUND TO 1ST FLOOR

A

ELEVATION OF STAIR 3 - GROUND TO 1ST FLOOR

B

SCALE 1:10

04

09.10.2017

03

20.09.2017

02

60 SOLID CARRARA MARBLE HANDRAIL

4 000

175

DIM. TBC AS PER SUTRUCTURE AND BUILD UPS STRUCTURE - BY ELITE TBC

ADHESIVE - BY EDM

R3

BUILD UP - BY OTHERS VARIES

1

86 FFL

90

VARIES

73

73

STONE FLOOR BUILD UP BY OTHERS

5

MID-LANDING

242

20

4

96 Finish

SCALE 1:20

BUILD UP - BY OTHERS

2

7

FLOOR BUILD UP BY OTHERS

25

R3

RSAL SECTION THROUGH CHEEK

STONE

FFL

2

11

90

175 315

10

ADHESIVE + DITRA MAT - BY EDM 21

63 2

STONE 11

STONE

NOTE: JOINTS 3mm & 1mm BETWEEN TREAD STONE AND METAL AS AGREED PREVIOUS WITH PTP. 1mm JOINT IS MINIMUM ACHIEVABLE WHEN THE LIGHT IS FACTORY BOUNDED.

21MM THK LAMINATED SGP INTERLAYER GLASS PANEL - BY OTHERS 86 Finish

90

62

7

1

315

96 Finish

58

MID-LANDING

STRUCTURE - BY ELITE TBC

90

67

FFL

R3 STONE

20

349

FLOOR BUILD UP BY OTHERS

ADHESIVE - BY EDM

96 Finish

181

ADHESIVE - BY EDM

330 Finish

ADHESIVE - BY EDM BUILD UP - BY OTHERS

11

SCALE 1:2

STONE

33

STRUCTURE - BY ELITE TBC

31

67

EDM ZONE

12 181 315

44

MID-LANDING

STRUCTURE - BY ELITE TBC

ADHESIVE - BY EDM

55 Finish

ISSUED FOR APPROVAL LEGEND

STRUCTURE - BY ELITE TBC ADHESIVE - BY EDM 158

R3

INDICATES STONE TO BE CUT AS PER SITE CONDITION INDICATES STONE TO BE CUT FROM WASTE SAVED PIECES INDICATES FIRST STONE TO BE INSTALLED

A 002

SECTION LINE -

REFERENCE DRAWING NUMBER

01 002

DETAIL -

REFERENCE DRAWING NUMBER

20

17

02

SCALE 1:2

MID-LANDING & FFL SECTION

04

SCALE 1:2

SHELF SECTION

57 15

158

ST-07.H

CALACATTA COLORADO - HONED FINISH (TREADS & MID-LANDINGS & EDGES DETAIL)

ST-04.P

20MM BIANCO P- POLISHED FINISH ( FFL & EDGES DETAIL)

43948 PGT Construction C2.3 - 300

TREAD BRACKET PLATES

50PGT_SK001_09.08.2016

LIGHT FITTING

3

20

R

1

363

39 38 13

3 R

60

10 28

E.Q 57

20MM BIANCO P- POLISHED FINISH ( FFL & EDGES DETAIL)

2

SURVEY UCES - METAL STEPS AND PARTITION WALLS

SCALE 1:2

SCALE 1:2

07

DATE 2017.02.08

DRAWING NUMBER 43948 PGT Construction C2.3 - 300

DESCRIPTION TREAD BRACKET PLATES

2016.08.09

50PGT_SK001_09.08.2016

LIGHT FITTING

MID LANDING - PLAN (HANDRAIL POSITON) SCALE 1:2

PROJECT

50 PGT 50, Palace Gardens Terrace W8 4RR London

R3

46

TITLE

STAIRCASE - TYPICAL DETAIL MID-LANDING, LANDING & SHELF

1

7 5

R3

20

EDM London

20

00

03.03.2017

REVISION

DATE

DATE 03.03.2011

STRUCTURE - BY ELITE TBC

SIZE A1

EDM LONDON

FFL

MODIFICATION

1:2

1, Warren Mews, London W1T 6AJ Tel: +44 (0) 207 874 1990, Fax: +44 (0) 207 874 1999 www.edm-paris.com

ADHESIVE - BY EDM BUILD UP - BY OTHERS

SUB CONTRACTOR

ISSUED FOR APPROVAL

SCALE

EDM London

SUPPORT ANGLES - BY ELITE TBC

STONE

20

STONE

20 3 20

15 3

UPDATED TO PTP COMMENTS - IFA

20

UPDATED TO PTP COMMENTS - IFA

19.05.2017

1 30 30 60 Finish

20 3 20

UPDATED AS PER PTP COMMENTS & SURVEY - IFC

06.07.2017

01

DRAWN BY A.CM

DRAWING NUMBER

16710:EDM: STAIRCASE TYPDET:TD4: 429

CHECKED BY

PROJECT NO.

16 710 2

20

SCALE 1:2

22.09.2017

02

10

RSAL SECTION - LIGHT & TREADS

20

03

10

58

15

38 13

3

R

3

09 425

3

16 710 2 60 Finish 30 30 1

PROJECT NO.

5

SUB CONTRACTOR

EDM LONDON

20

39

1, Warren Mews, London W1T 6AJ Tel: +44 (0) 207 874 1990, Fax: +44 (0) 207 874 1999 www.edm-paris.com

97 54

CALACATTA COLORADO - HONED FINISH (TREADS & MID-LANDINGS & EDGES DETAIL)

ST-04.P

60

R3

158

ST-07.H

33

19-07-2017

QUARTER LANDING - SECTION (LIGHT RECESS- PLY BOX)

06

SCALE 1:2

176

17

REFERENCE DRAWINGS

SHELF - PLAN DETAIL (LIGHT RECESS)

HOUSING TO BE INSTALLED IN FACTORY STRUCTURE - BY ELITE TBC ADHESIVE - BY EDM

315

1

WALL TO BE CUT TO ALLOW THE STONE GOES UNDER

05

RANSVERSAL SECTION - TREADS CL OF TREAD

60

ALL JOINT SIZES XXmm

1. DO NOT SCALE FROM DRAWINGS. 2. SITE DIMENSIONS TO BE VERIFIED PRIOR TO CONSTRUCTION. 3. REPORT ALL DISCREPANCIES TO EDM IMMEDIATELY. 4. READ IN CONJUNCTION TO ALL RELEVANT DOCUMENTS AND DRAWING. 5. EDM LONDON LTD ALL RIGHTS RESERVED ©

STAIRCASE - TYPICAL DETAIL TREAD - TD4

58

REFERENCE DRAWING NUMBER

DIMENSION TO BE CONFIRMED

SURVEY

TITLE

3

182

REFERENCE DRAWING NUMBER

STONE SIZES SHOWN IN MAGENTA TEXT

NOTES

50 PGT 50, Palace Gardens Terrace W8 4RR London

97 176

1

49

PROJECT

5

54

E.Q

90

17

2017.02.08 2016.08.09

4

6

INDICATES STONE TO BE CUT FROM WASTE SAVED PIECES

DETAIL -

QUERY

26

DESCRIPTION

3

158

INDICATES STONE TO BE CUT AS PER SITE CONDITION

SECTION LINE -

01 002

17

17

STRUCTURE - BY ELITE TBC ADHESIVE - BY EDM

315

E.Q

A 002

SPECIFICATION

DRAWING NUMBER

DATE

E.Q

DIRECTION OF VEIN

*

60

REFERENCE DRAWINGS

CL OF TREAD

39

SCALE 1:2

LIGHT FIXTURE HOUSING TO BE INSTALED ON FACTORY

3 1. DO NOT SCALE FROM DRAWINGS. 2. SITE DIMENSIONS TO BE VERIFIED PRIOR TO CONSTRUCTION. 3. REPORT ALL DISCREPANCIES TO EDM IMMEDIATELY. 4. READ IN CONJUNCTION TO ALL RELEVANT DOCUMENTS AND DRAWING. 5. EDM LONDON LTD ALL RIGHTS RESERVED ©

LEGEND

PLINTH MADE WITH PLYWOOD BOX TO CLADDING WITH STONE BY OTHERS

COMMENTS SURVEY UCES - METAL STEPS AND PARTITION WALLS

91

RANSVERSAL SECTION - TREADS

DATE

2

28

NOTES

SURVEY 19-07-2017

58

73

3

3

182

ISSUED FOR CONSTRUCTION

ADHESIVE BY EDM

R

97 176

158 60

STRUCTURE BY ELITE

13

167

SCALE 1:2

315

DIMENSION TO BE CONFIRMED

SPECIFICATION

159

BALUSTRADE SECTION

03

SCALE 1:2

STONE SIZES SHOWN IN MAGENTA TEXT

QUERY

2

MID-LANDING SECTION

01

60

CL OF TREAD 315

DIRECTION OF VEIN

*

356

7

17

FINISHES - BY OTHERS

L ELEVATION OF MARBLE CHEEK

M.O REVISION

03 02

03

01

08

LANDING HANDRAIL - PLAN SCALE 1:2

09

LANDING HANDRAIL - SECTION SCALE 1:2

UP

UP

19.05.2017

00

03.03.2017

ISS

REVISION

DATE

MO

UP

DATE

SCALE

03.03.2011

1:2

16710 :EDM:MAIN

26

17

UP

06.07.2017

01

DRAWING NUMBER

33

61

60

12

BLIND HOLES TO SUIT 6MM PINS TO BE DRILLED ON SITE 175 x 60 x 8mm CLAMPING PLATE (3mm ALLOWANCE FOR ADHESIVE)

20.09.2017

UPDATED AS PER PTP COMMENTS & SURVEY - IFC

06.07.2017

UPDATED TO PTP COMMENTS - IFA

19.05.2017

UPDATED TO PTP COMMENTS - IFA

00

03.03.2017

ISSUED FOR APPROVAL

REVISION

DATE

MODIFICATION

DATE

SCALE

03.03.2011

1:2

SIZE A0

DRAWN BY A.CM

CHECKED BY M.0

DRAWING NUMBER

REVISION

16710:EDM: STAIRCASE TYPDET: 425

03

Margarida Oliveira // PORTFOLIO. [margarida.s.s.oliveira@gmail.com // +44 (0)7593727628 // +351 968995024]


02.

11 Upper Belgrave Street / LONDON

YEAR/Status: 2016 // Design Intent Approval & Construction and Cutting list // Status: ON-Going PROGRAM: Design, Supply and Stone installation OFFICE: EDM, LONDON TEAM: Margarida Oliveira, Design coordinator + Bastien Yalicheff, Project Manager MY COMPETENCE: Drafting and checking all stages of Drawings, coordinating and managing in-house and overseas-based drafters from design to detailing/construction stage. Responsible for stone design and coordination with various interior trades for bathrooms CliENT: Private Budget: £200K 91 Str EQ2

981

980

1984 Str 1910 Finish

894 - GULLEY

1184 272 Finish

1910 Finish 6046 Finish

F24

224

206.F.02

272 Finish

1291 Finish 1373 Str

F10

F23

69

5700 Finish 5209 Finish

145 Finish

206.F.01

69

2

2

F21

F21

F21

F21

206.F.01

111

CP

753 Finish 859 Finish

793 K 176 DW21

210 Finish

210 Finish 105 Str

SIZE OF THIS COLUMN PER SURVEY DIM. IT'S NOT POSSIBLE TOACHIEVE 141mm AS PER THE OTHER COLUMNS

193 Finish

L 176

206.F.18

272 Finish

1057 666 Finish

J 176

Df23

FB 178

206.F.01

225 Finish

DW20

DW24

170

1331

764 684 Finish

149

D2-11

370

F9

I 176

O 177

P 177

141

F8 1184

N 177

M 177

206.F.01

206.F.01

894 950*

K 176

L 176

DW22

PLASTER CEILING BY OTHERS

684 Finish

NOTE

VEIN DIRE PEN

S = STRUC FACE

225 Finish

CEILING PLAN SCALE 1:10

ISSUE LEGEND

1144 Finish 1166 Str

856 776 Finish

48 Finish

F7

141

224 Finish

224

127 EQ5

206.F.01

206.F.01

CL OF WALL PANELS 245 Finish

35

POCKET DOOR

DW23

DW18

07 179

1004

115 F6 206.F.01

225 Finish

201 Finish

1000

370

177 Finish

1025 666 Finish

156 Finish

06 179

141

489

SIZE OF THIS COLUMN PER SURVEY DIM. IT'S NOT POSSIBLE TOACHIEVE 141mm AS PER THE OTHER COLUMNS

1660

1940 - BATHTOP

J 176

I 176

140 EQ4

BATH RECESS

EQ6

73

104 Str 210 Finish

277

F5 F4

660

50

140 EQ4

900 Finish

50

120

894 Finish

127 EQ5

206.F.09

50

1000

141

4 Str

WD19

F26 206.F.01

BT1

100 731

206.F.01

116

F25 206.F.01

370

SF4 206.F.01

731

1000

18

R3

177 Finish

50

SHOWER CUBICLE 50

100

328 Finish EQ

BT1

915 - BATHTOP

100 50 120

05 179

NICHE 206.F.07

408

508

206.F.18

206.F.01

1169 Str 1144 Finish

831

681 G 175

H 175

50

35

POCKET DOOR

CL OF WC & NICH

E 175

CL OF SHOWER

1028 440

F 175

681

708

WXX

897 Str 684 Finish 724

635 Finish

50

831

SF2

95 Str

NICHE / CISTERN BOXING BELOW

881 100

180 Finish 178

968 Str 890 Finish 930

CL OF DOOR OPENING

338 Finish EQ

881

100

CL OF SHOWER

1156 Str 1068 Finish 400 Finish - NICHE

G1

50

78

G1

94 Str

CP 170

01 175 SF1

897 Str 682 Finish 724

EQ3

CL OF WINDOW & BATH

894 - GULLEY

03 176

95 Str

EQ3 101

CL OF DOOR OPENING

2045 Str 1962 Finish EQ2 101

245 Finish

206.F.01

45

979

F20

63

979

F20 2 69

2

206.F.01

F22

F20

45

2-06 ENSUITE BATHROOM FFL +59.286

F20

206.F.01

206.F.01

718 V1

F13

206.F.09

206.F.01

20mm SIER

206.F.02

15X15MM G

206.F.15

Ondina Mari

F17

F16

F15

206.F.01

206.F.01

206.F.01

DRAWIN 236154-5

21.04.2017

236154-5

21.04.2017

236154-5

11 11 Lo

F14

TITLE

2Fl

02 176 THE VANITY IS CENTERED WITH THE NICHE SURVEYED

695

800

800

1332

711

EQ1

165

EQ1 767

EQ1 739

767

1577 Finish 1596 Str

2962 Finish 3043 Str

1506 Finish 1541 Str

PLAN

A

DATE 04.09.20

PROJECT

612 1348 EQ1

30mm CIPO

206.F.01

EQ6

VANITY TOP

WINDOW JOINERY BY OTHERS

810

MIN 20mm O

206.F.09

DATE 02.03.2017

01 176

858 Finish 884 Str

489

F18

THE VANITY IS CENTERED WITH THE NICHE SURVEYED 221

206.F.18

REFERENCE DRA

165

F24

206.F.02

206.F.01

F19

MIN 20mm B

6. EDM London is part of Atel

224 Finish

EQ6

68

48 Finish

VANITY TOP

206.F.09

MIN 20mm O

206.F.07

3

206.F.01

206.F.01

F21

45

V1

F1

DIM

206.F.06

2

F21

CL OF WALL PANELS

206.F.01

ST

1. DO NOT SCALE FROM D 2. SITE DIMENSIONS TO B 3. REPORT ALL DISCREPA 4. READ IN CONJUNCTION 5. EDM LONDON LTD ALL

2

F21

206.F.01

17

SURVEY 1

69

F21

F23

DE

NOTES

F12

F20

F20

206.F.01

221

D2-06

489

206.F.01

C 173

F20

F20

206.F.01

194 250* 63

979

B 172

CL OF NICH

69

F20

2

F20

01 002

206.F.01

EQ7 63

979

2084 Finish 2532 Finish

979

D 174

69

1071

63

979

IND

SE

QUERY

45

F20

F11

206.F.02

2

63

979

F22 206.F.01

718

979 F20

A 171

F2

881 Str 858 Finish

63

IND IND

A 002

SPECIFICATION

EQ7 63

489 CL OF DOOR FRAMES

CL OF NICH

838 Str 755 Finish 730 Finish - OPENING DOOR

979 206.F.01

69

249 300*

D2-03

63 F20

206.F.01

1071

63

F20 206.F.02

730 Finish - OPENING DOOR 755 Finish 834 Str

979

F3 206.F.01

DIR

*

1 Tel: +44 (0

SCALE 1:10

SUB CONTRA

EDM LON

206.F.06

706

1041

W31

206.F.06

1041

Fr23

141

W20

W9

Fr42 746

141

W43

206.F.06

01

149 40

206.F.18

R9

28

W15

706

Df24

Df31

Df33

Fr34

Fr41

Fr43

177012: EDM

WC DOOR BY OTHERS

VEIN DIRECTION SHOWN INDICATIVELY PENDING SLAB SELECTION S = STRUCTURAL DIMENSION IS AT FACE OF PLYWOOD BY OTHERS

W36

W42

ISSUED FOR CONSTRUCTION

983 Fr7

W8

206.F.18

312 Finish

1830 Finish

313 Finish

206.F.06

Fr12

Fr16

W14

Df30

DIRECTION OF VEIN

225 Finish

206.F.06

W19

W25

W29

17 A

666 Finish

218 Finish

206.F.06

Fr31

Fr40

DIMENSION TO BE CONFIRMED

01 002

SPECIFICATION 206.F.06

MIN 20mm ONYX AKDAG - POLISHED FINISH

206.F.07

MIN 20mm BELGIUM BLACK - POLISHED FINISH

206.F.18

MIN 20mm ODINA MARINA - POLISHED FINISH

206.F.09

30mm CIPOLLINO CREMO - POLISHED FINISH

206.F.01

W41

Fr44

STONE SIZES SHOWN IN MAGENTA TEXT

002

QUERY

206.F.06

W35

Fr35

206.F.02 206.F.15

BN1

NOTES

Fr9

Df1

Df9

W6

W12

Fr10

Fr18

Df10

Df18

206.F.06

206.F.06

Bs4

Fr19 W17

Bs5 826

426

Bs16 Bs6 826

206.F.06

Bs18

Bs8 Bs9

Fr36

W28 206.F.06

Fr28

Fr29

Fr37

Df19

Df27

COMMENTS PLYWOOD PARTITION -

3 1. DO NOT SCALE FROM DRAWINGS. 2. SITE DIMENSIONS TO BE VERIFIED PRIOR TO CONSTRUCTION. 3. REPORT ALL DISCREPANCIES TO EDM IMMEDIATELY. 4. READ IN CONJUNCTION TO ALL RELEVANT DOCUMENTS AND DRAWING. 5. EDM LONDON LTD ALL RIGHTS RESERVED ©

REFERENCE DRAWINGS

Fr39

Fr45

W34 W27

Ondina Marina Mosaic 10mm thick (supplied by IME)

-

DESCRIPTION

DATE

DRAWING NUMBER

02.03.2017

236154-5087.H.CONS

21.04.2017

236154-5088.H.CONS

INTERNAL ELEVATIONS SHEET 1

21.04.2017

236154-5099.F.CONS

INTERNAL ELEVATIONS SHEET 2

PLAN & RCP

W40

206.F.06

W33

Fr38

Fr46

Df28

Df36

206.F.06

W39 PROJECT

Bs7

Bs2

01 171

Fr30

Bs19

Df35

206.F.18

678

Bs20

Bs17

Bs3 Bs1

W23

11 UBS 11, Upper Belgrave Street London

TITLE

Bs10

2-06 Ensuite Bathroom Elevations

ELEVATION 206.F.03 3mm METAL ANGLE AS APPROVED SAMPLE 206.F.02 15x15x10mm THICK MOSAIC "FIRE EARTH" WITH 3mm GROUT

5-10mm LATEX SCREEDBY EDM UNDER FLOOR HEATING - BY OTHERS

1, Warren Mews, London W1T 6AJ Tel: +44 (0) 207 874 1990, Fax: +44 (0) 207 874 1999 www.edm-paris.com

11

STONE

PROJECT NO.

EDM LONDON

17 7012 (2)

FLOOR BUILD UP BY OTHERS (SHOWN INDICATIVELY) 26.06.2017

UPDATED AS PER ARCH. COMMENTS & SURVEY - IFC

00

13.06.2017

ISSUED FOR APPROVAL

REVISION

DATE

MODIFICATION

01

*

01

SUB CONTRACTOR

5-10

11mm ADHESIVE + WATERPROOFING SYSTEM - BY EDM

20

EDM London

EDM ZONE

SCALE 1:10

31

A

Bs15

426

Bs14

Df29

138

206.F.06

Fr1

Bs13

Df26

206.F.18

W24 1910 Finish

Bs12 W13

Df20

Bt1

20mm SIERA PUERTA - NOM 692 SQ POLISHED FINISH FLOOR & BOARDER 15X15MM Greek Key Pattern Mosaic

DATE 04.09.2017

2

Fr27

1940 Finish

138

W1

Bs11

Fr17

W7

138

206.F.06

FFL +59.286

Fr11

W18

206.F.07

600 Finish

Fr8

W2

678

Fr2

Fr20

Df17

206.F.18

138

Df11

Df8

206.F.18

220 Finish

SURVEY 1

Df2

REFERENCE DRAWING NUMBER

DETAIL -

206.F.18

684 Finish

INDICATES STONE TO BE CUT AS PER SITE CONDITION INDICATES FIRST STONE TO BE INSTALLED INDICATES STONE TO BE CUT FROM WASTE SAVED PIECES REFERENCE SECTION LINE DRAWING NUMBER

Df34

2935 Finish 3077 Str

776 Finish

Df25

Df21

206.F.07

206.F.06

Fr3

Fr26 F26

983

225 Finish

2770 Finish

666 Finish

206.F.06

W3

Fr21

206.F.18

2770 Finish

206.F.18

201 Finish

Df16

Df12

*

MIRROR BY OTHERS

2770 Finish

Df7

1942 Finish

LEGEND

Df4

DATE

DRAWING NUMBER

206.F.18

Df22 Fr32

W30

13.06.20

REVISION DATE

NOTE

W26

26.06.20

00

13.06.2017

Fr25

983

Fr22

Fr15

206.F.06

W38

Df32

1003

1003

983

SHOWER SCREEN BY OTHERS

Df15

764

Df23

206.F.07

Df13 Fr13

Fr33

W37

724

Fr24 206.F.06

206.F.18

Df6 Fr6

W32

983

141

816

206.F.18

W4

Fr14

856

Df14

Df4 Fr4

206.F.06

W22

1003

141

Df5

CL OF WINDOW & BATH

W21

123 180*

Fr5

746

W16

178 Finish

206.F.06

40

W11

1003

112

W10

983

+62.221 FINISHED CEILING

W6

123 180*

W5

MOSAIC FLOOR BUILD UP - WET AREAS SCALE 1:2

DATE 13.06.2017

SCALE

SIZE

1:10

A1

DRAWN BY

DRAWING NUMBER

177012: EDM : 2-06 : ELEV :171

ED

CHECKED BY M.O REVISION

01


CEILING VARIES , SHOWN INDICATIVELY - BY OTHERS 15x15mm REBATE -BY EDM

MAXIMUM 400mm

12.5mm SCHLÜTER-KERDI-BOARD - BY OTHERS 15

15

STONE

20

2

INTERNAL DOOR CORNER PLAN DETAIL SCALE 1:2

15

20

2

20

15

01

R

20 28 EDM ZONE

WATERPROOFING SYSTEM: SCHLÜTER-KERDI-BOARD (BY OTHERS) JOINTS WILL BE FULLY COVERED WITH SEALING BAND SCHLÜTER-KERDI-KEBA (MIN WIDTH 12.5MM) USING SEALING ADHESIVE SCHLÜTER-KERDI-COLL. THE SEALING BAND SHOULD OVERLAP THE JUNCTION BY AT LEAST 5CM ON EACH SIDE. INTERNAL AND EXTERNAL CORNERS WILL BE SEALED WITH SCHLÜTER-KERDI-KERECK-F USING SCHLÜTER-KERDI-COLL.

02

INTERNAL CORNER PLAN DETAIL

16

'EASED' EXTERNAL CORNER PLAN DETAIL - MITERED

03

SCALE 1:2

31

DOOR FRAME BY OTHERS

5 R1

40

5 20 40 WATERPROOFING SYSTEM: SCHLÜTER-KERDI-BOARD (BY OTHERS) JOINTS WILL BE FULLY COVERED WITH SEALING BAND SCHLÜTER-KERDI-KEBA (MIN WIDTH 12.5MM) USING SEALING ADHESIVE SCHLÜTER-KERDI-COLL. THE SEALING BAND SHOULD OVERLAP THE JUNCTION BY AT LEAST 5CM ON EACH SIDE. INTERNAL AND EXTERNAL CORNERS WILL BE SEALED WITH SCHLÜTER-KERDI-KERECK-F USING SCHLÜTER-KERDI-COLL.

20

WATERPROOFING SYSTEM: SCHLÜTER-KERDI-BOARD (BY OTHERS) JOINTS WILL BE FULLY COVERED WITH SEALING BAND SCHLÜTER-KERDI-KEBA (MIN WIDTH 12.5MM) USING SEALING ADHESIVE. SCHLÜTER-KERDI-COLL. THE SEALING BAND SHOULD OVERLAP THE JUNCTION BY AT LEAST 5CM ON EACH SIDE. INTERNAL AND EXTERNAL CORNERS WILL BE SEALED WITH SCHLÜTER-KERDI-KERECK-F USING SCHLÜTER-KERDI-COLL.

20

8

* WATERPROOFING SYSTEM: SCHLÜTER-KERDI-BOARD (BY OTHERS) JOINTS WILL BE FULLY COVERED WITH SEALING BAND SCHLÜTER-KERDI-KEBA (MIN WIDTH 12.5MM) USING SEALING ADHESIVE SCHLÜTER-KERDI-COLL. THE SEALING BAND SHOULD OVERLAP THE JUNCTION BY AT LEAST 5CM ON EACH SIDE

CEILING JUNCTION - WET AREAS

04

SCALE 1:2

8mm ADHESIVE + WATERPROOFING SYSTEM BY EDM

140

170 2

25

12.5mm SCHLÜTER-KERDI-BOARD - BY OTHERS

28 EDM ZONE

STONE

136

8mm ADHESIVE + WATERPROOFING SYSTEM - BY EDM 12.5mm SCHLÜTER-KERDI-BOARD * - BY OTHERS

28

20

STONE

12.5mm SCHLÜTER-KERDI-BOARD - BY OTHERS

MAXIMUM 400mm

20

25

20 12

STONE

MARINE PLYWOOD BY OTHERS

STUDWORK BY OTHERS

STONE

8mm ADHESIVE + WATERPROOFING SYSTEM - BY EDM

EDM ZONE

STRUCTURE BY OTHERS

8 20

15

5

R

5 R1

136

20 40

5

BY OTHERS

8

15

16

20

2

20

20

8mm ADHESIVE + WATERPROOFING SYSTEM BY EDM

20

20

8

MARINE PLY BY OTHERS

MARINE PLY BY OTHERS

MARINE PLYWOOD BY OTHERS

STRUCTURE VARIES - SHOWN INDICATIVELY - BY OTHERS

12

8

20

STUDWORK BY OTHERS

SCALE 1:2

12.5mm WALL BOARD - BY OTHERS 12.5mm SCHLÜTER-KERDI-BOARD - BY OTHERS

12.5mm WALL BOARD - BY OTHERS

127

127

112

POLISHED PLASTER WALL - BY OTHERS

15 20

15

TIMBER SUPPORTS - BY OTHERS

4

2 12.5mm SCHLÜTER-KERDI-BOARD - BY OTHERS

8 20

8mm ADHESIVE + WATERPROOFING SYSTEM BY EDM

45

8mm ADHESIVE + WATERPROOFING SYSTEM - BY EDM 12.5mm SCHLÜTER-KERDI-BOARD - BY OTHERS

ACCESS PANEL - BY OTHERS

WATERPROOFING SYSTEM: SCHLÜTER-KERDI-BOARD (BY OTHERS) JOINTS WILL BE FULLY COVERED WITH SEALING BAND SCHLÜTER-KERDI-KEBA (MIN WIDTH 12.5MM) USING SEALING ADHESIVE. SCHLÜTER-KERDI-COLL. THE SEALING BAND SHOULD OVERLAP THE JUNCTION BY AT LEAST 5CM ON EACH SIDE. INTERNAL AND EXTERNAL CORNERS WILL BE SEALED WITH SCHLÜTER-KERDI-KERECK-F USING SCHLÜTER-KERDI-COLL.

TIMBER FRAME - BY OTHERS BATH - BY OTHERS

TIMBER FRAME TIMBER SUPPORTS BATH - BY OTHERS

06

05

R5 STONE

STONE

45

12.5

14

8

2

10

MARINE PLY BY OTHERS

10

STONE

30

STONE

30

R1

5

112

MARINE PLYWOOD BY OTHERS

ACCESS PANEL CATCH - BY OTHERS

MARINE PLYWOOD BY OTHERS

12

MARINE PLYWOOD BY OTHERS

BATH SPOUT AND TAP - BY OTHERS

BATH TOP DETAIL A SCALE 1:2

07

DADO - TOILET WALL DETAIL SCALE 1:2

BATH TOP DETAIL B SCALE 1:2

Margarida Oliveira // PORTFOLIO. [margarida.s.s.oliveira@gmail.com // +44 (0)7593727628 // +351 968995024]


03.

Private House / Lisbon

YEAR/Status: 2015 // Planning Application & contruction // Status: Build PROGRAM: 4 bed family house OFFICE: Margarida Oliveira, Arq. TEAM: Margarida Oliveira MY COMPETENCE: Sketches/ Concept design/ Cad drawings/ 3D/ Models/Detail drawings/ Planning Aplication/ Building Regulations/ Dealing with manufactures/ Site works supervision. CliENT: Private BUILDING ID: 350m2 plot area / 117,60 m2 implantation area(total) / 2 floor above the ground Budget: 200K


Janela tipo Velux (940X1600mm) - elétrica GGL INT

- Todas as medidas indicadas neste desenho deverão ser devidamente verificadas na prepa Código de direitos de autor, esta peça desenhada considera-se propriedade intelectual da M

Margarida Oliveira // PORTFOLIO. [margarida.s.s.oliveira@gmail.com // +44 (0)7593727628 // +351 968995024] - Todas as medidas indicadas neste desenho deverão ser devidamente verificadas na prepa Código de direitos de autor, esta peça desenhada considera-se propriedade intelectual da M


- Todas as medidas in

Cรณdigo de direitos de


Margarida Oliveira // PORTFOLIO. [margarida.s.s.oliveira@gmail.com // +44 (0)7593727628 // +351 968995024]


04.

NEw Civic Center Woodside House / HARINGEY, London

YEAR/Status: 2008 // Feasibility study, Design Development PROGRAM: Renovation and Rear Extension OFFICE: Capita Architecture, London TEAM: Margarida Oliveira, Rui Cancela MY COMPETENCE: Sketches/ Concept design/ Cad drawings/ 3D/ Presentations/Photoshop/Models


Margarida Oliveira // PORTFOLIO. [margarida.s.s.oliveira@gmail.com // +44 (0)7593727628 // +351 968995024]


05.

Hilton lagos Hotel / Nigeria

YEAR/Status: 2009 // Design Development PROGRAM: 90 Rooms, Conference Room,3 Meeting rooms, Shops, Spa, Pool, 2 restaurants,1 Coffee Lounge OFFICE: Capita Architecture, London TEAM: Margarida Oliveira, Piotr Skrzycki, David Russel - Director MY COMPETENCE: Sketches/ Concept design/ Cad drawings/ 3D/ Presentations/Photoshop/Models CliENT: Private


Margarida Oliveira // PORTFOLIO. [margarida.s.s.oliveira@gmail.com // +44 (0)7593727628 // +351 968995024]


06.

Private HousE, Leria / Portugal

YEAR/Status: 2005 // Planning Application // Status: Build PROGRAM: 4 bed family house OFFICE: RCDC TEAM: Margarida Oliveira, Rui Cancela, Dina Castro MY COMPETENCE: Sketches/ Concept design/ Presentations/Photoshop/Models/Cad drawings/Planning Aplication/Building Regulations CliENT: Private BUILDING ID: 3.180.00 m2 plot area / 188,20m2 implantation area / 2 floor above the ground


Margarida Oliveira // PORTFOLIO. [margarida.s.s.oliveira@gmail.com // +44 (0)7593727628 // +351 968995024]



Margarida Oliveira // PORTFOLIO. [margarida.s.s.oliveira@gmail.com // +44 (0)7593727628 // +351 968995024]


07.

Residential building, Azinhaga das Galhardas / Lisbon

YEAR/Status: 2007-2008 // Scheme design, Planning application and construction drawings // Staus: Build PROGRAM: 144 Flats (1 bed to 5 bed and 6 bed duplex), heated pool, kindergarten, changing and multipurpose rooms OFFICE: AIC, Arquitectos TEAM: Margarida O., Alexandra C., Patricia M., Bernado L., Meira de Cravalho_Arq. MY COMPETENCE: Sketches/ Concept design/ Presentations/ Cad drawings for planning and construction phases CliENT: Private BUILDING ID: 20 structural floors, 3 below ground (12,500m² of parking + 5,000m² of commerce) 16 floors above (26,500m² of housing) 324 parking spaces and 147 storage rooms, entrance area of the condominium, technical zones and a shopping area, in addition 64 parking spaces with own entrance. Budget: 28M


Margarida Oliveira // PORTFOLIO. [margarida.s.s.oliveira@gmail.com // +44 (0)7593727628 // +351 968995024]



Margarida Oliveira // PORTFOLIO. [margarida.s.s.oliveira@gmail.com // +44 (0)7593727628 // +351 968995024]


08.

Residential building PORTAS DO TEJO, Park Expo / LiSBON

YEAR/Status: 2000-2001 // Scheme design, Planning application and construction drawings // Staus: Build PROGRAM: 128 Flats (1 bed to 4 bed), kindergarten OFFICE: AFR, Arquitectos TEAM: Margarida O., Nuno S., Miguel F., Jorge S., Antonio Fernandes Rodrigues_Arq. MY COMPETENCE: Sketches/ Concept design/ Presentations/ Cad drawings for planning and construction phases CliENT: Private BUILDING ID: Area 31.150m² (total) / 12 structural floors, 2 below ground of parking +10 floors above of housing


Margarida Oliveira // PORTFOLIO. [margarida.s.s.oliveira@gmail.com // +44 (0)7593727628 // +351 968995024]


09.

Residential building LUna Mar&Luna Rio, Park Expo / LiSBON

YEAR/Status: 2002-2003 // Scheme design, Planning application and construction drawings // Staus: Build PROGRAM: 57 Flats (1 bed to 5 bed Duplex), Garden, Lake, Private Pools, terraces, and balconies OFFICE: AFR, Arquitectos TEAM: Margarida O., Nuno S., Miguel F., Jorge S., Antonio Fernandes Rodrigues_Arq. MY COMPETENCE: Sketches/ Concept design/ Presentations/ Cad drawings for planning and construction phases CliENT: Private BUILDING ID: Area 28.546m² (total) / Face River Building (3 structural floors, 1 below ground of parking +2 floors above of Housing) Rear building (6 structural floors, 1 below ground of parking +5 floors above of housing)


Margarida Oliveira // PORTFOLIO. [margarida.s.s.oliveira@gmail.com // +44 (0)7593727628 // +351 968995024]


10.

Aรงoreana Office / Lisbon

YEAR/Status: 2007 // Design Development and Construction // Status: Build PROGRAM: Office Interior Renovation // Meeting rooms, operational open space, Adm. rooms, storage rooms, Longe and Reception area. OFFICE: AIC, Arquitectos TEAM: Margarida Oliveira, Bernardo Lopes, Meira de Carvalho_Arq. MY COMPETENCE: Sketches/ Concept interior design/ Funcional Layout/ Cad drawings/ Presentations/ Photoshop CliENT: Private


Margarida Oliveira // PORTFOLIO. [margarida.s.s.oliveira@gmail.com // +44 (0)7593727628 // +351 968995024]


11.

Residential Building, Luis Padre aparĂ­cio / Lisbon

YEAR/Status: 2006 // Planning Application PROGRAM: Existing office Building Converted into Residencial Building (18 Flats), Shops, Parking area, storage rooms. OFFICE: AIC, Arquitectos TEAM: Margarida Oliveira / Carla Vieira da Silva MY COMPETENCE: Sketches/ Concept design/ Cad drawings for planning and construction phases CliENT: Private BUILDING ID: 6 structural floors, 1 below ground of parking +5 floors above of housing


Margarida Oliveira // PORTFOLIO. [margarida.s.s.oliveira@gmail.com // +44 (0)7593727628 // +351 968995024]


12.

Private House / Rua S.Joaquim, Lisbon

YEAR/Status: 2015 // Planning Application PROGRAM: Conversion and Rear Extension Pombaline Building (5 bed family House) OFFICE: AIC, Arquitectos TEAM: Margarida Oliveira, Ana Moreira, Meira de Cravalho_Arq. MY COMPETENCE: Concept design to client approval / Presentations / Photoshop / Cad drawings / Detail drawings CliENT: Private


Margarida Oliveira // PORTFOLIO. [margarida.s.s.oliveira@gmail.com // +44 (0)7593727628 // +351 968995024]


COMPETITIONS



14.

King´s X Square, International design Competition / London

YEAR/Status: 2008 // International Design Competition PROGRAM: New public plaza immediately south of King’s Cross station OFFICE: Capita Architecture, London TEAM: Margarida Oliveira, Matteo Gerbi, Mark George Physsas, Jay Alom, Claudia Alves, Rui Cancela, Andrew Pryke, Gary Williams MY COMPETENCE: Sketches/ Concept design/ 3D/ Presentations/Photoshop/Models Square ID: aprox. 7000m2 in area


Margarida Oliveira // PORTFOLIO. [margarida.s.s.oliveira@gmail.com // +44 (0)7593727628 // +351 968995024]


15.

International URBAN COMPETION, Poรงo do BISPO / LISBON

YEAR/Status: 2003// IIV International Seminar of Architecture PROGRAM: New public passage across the site, Urban intervention at Poรงo do Bispo TEAM: Margarida Oliveira, Claudia Costa, coordination by: Arch.Marcel Meili and Arch. Diogo Lopes MY COMPETENCE: Sketches/ Concept design/ CAD DRAWINGS/Presentations/Photoshop/Models


Margarida Oliveira // PORTFOLIO. [margarida.s.s.oliveira@gmail.com // +44 (0)7593727628 // +351 968995024]



ABOUT ME These are some examples of my work over the last 16 years, working an architectural practices and a freelance projects, managed from the initial design stage right through to completion. It has been a very rich path of professional and personal development where communication, leadership and Technical skills gained through working in multidisciplinary projects, are key elements. As result of that I´ve been able to develop a comprehensive overview and pragmatic vision, based on a proactive approach where my involvement goes beyond simple production but always remains focused on delivering high quality at all stages of a project.

Cooperative by nature I am able to work effectively both independently and as part of a team. I enjoy and get motivated when understanding and looking deeper into the existing problems and sorting out solutions by sharing ideas and knowledge with my colleagues. I’m always open to any feedback so I can learn how to improve my skills and knowledge. Individually I´m attentive to details, good to managing my time, prioritizing tasks and being able to take more responsibilities whenever necessary. Always driven by the idea that we can always learn more! Always ready to get the best out of me! As a future achievement, I would like to be involved residential projects as well as in new developments, either commercial, residential or mixed use. Thank you so much for your time!

Speak soon ? margarida.s.s.oliveira@gmail.com // +44 (0)7593727628


THANK YOU!


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.