NEES - Offshore Wind Turbines

Page 41

FLOODING & SINKING • The intake of the water during the flooding phase is powered by the pressure exerted by the weight of all the water directly above the valve. Therefore, as the tower sinks deeper, this pressure will increase, due simply to there being an increasing weight of water above it. The rate of fill will therefore increase as well.

• The inlet valves will have to be placed below the surface of the water, so as to make the best possible use of this pressure. They must, however, not be too deep, as that would make it difficult to operate them whilst out at sea.

• Moreover, as the pressure forces acting on the inlet valve do increase, both the speed of the water and its Dynamic Pressure (pressure exerted by the water in its direction of travel) will do the same. The flow of water will therefore exert substantial frictional forces on the concrete material surrounding the edge of the valve as it passes through, making it susceptible to wear. As such, the need to line the inside of the valves with a hard, wear-resistant material, such as Tungsten-Carbide becomes apparent, in order to mitigate this.

• However, whilst all this is going on, the Static Pressure of the water (the pressure exerted outwards against the insides of the valve) will in fact decrease. This is because, in moving faster through the valve, each individual water molecule effectively spends less time in contact with its inside faces, and so less pressure overall is exerted in this direction. Intrinsically, this has the effect of leading to the implosion of any bubbles that may exist in the water, in turn leading to a process called Cavitation, whereby material is gradually ripped away from the sides of the valve. Again, lining is therefore necessary so as to prevent this.

Engineering Education Scheme: The Report | Flooding & Sinking

41


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Evaluation

20min
pages 52-59

Our Process Journal

1min
page 51

Conclusion

3min
pages 49-50

Testing

8min
pages 45-48

Points for Consideration (Includes Further Intense Maths & Physics

5min
pages 42-44

Flooding & Sinking

1min
page 41

Mathematics Behind the Design

12min
pages 35-40

Chosen Design For Floatation Device

5min
pages 30-32

Evaluation of Initial Design Ideas

14min
pages 25-29

The Designs

0
page 22

Towing & Stabilisation

1min
page 18

Residential Trip to Canterbury

7min
pages 19-21

Launch Strategies & Transport

1min
page 17

Materials’ Properties

1min
page 14

Research & Development

1min
page 13

Our Planning

0
page 10

Initial Specification

3min
pages 11-12

The Potential Solution

1min
page 7

Meeting Our Engineer

2min
page 9

Our Visit to BAE Systems

1min
page 8

Our Team

0
page 3

The Possible Projects Available

2min
pages 5-6

Engineering Education Scheme (Background

0
page 4
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.