Cranes and Lifting November 2021

Page 90

LIFT OF THE MONTH PLEASE SEND YOUR LIFT OF THE MONTH ENTRIES TO SIMON.GOULD@PRIMECREATIVE.COM.AU

WHO: Advanced Cranes WHERE: Gippsland, Victoria LIFT: Dismantle of Maffra Weir. CRANE: Liebherr LTM 1450-8.1. CONFIGURATION: LTM 1450-8.1 was set up with a 28 metre luffing lattice jib and total ballast of 134t. The heaviest load for the 8-axle crane was 32 tonnes plus 4 tonnes for rigging and hook at a 34-metre radius and a maximum hook height of 20 metres.

WHO: Borger Cranes and Rigging Services WHERE: Auchenflower Station, Brisbane. LIFT: New pedestrian overpass weighing 56t with rigging. CRANE: Liebherr LTM 1650-8.1. CONFIGURATION: 155t of counterweight. 52m Main Boom. Pick radius was 26m with the 8.4m counterweight position.

WHO: Mammoet. WHERE: Vienna, Austria. Crane: DEMAG CC 8800-1. LIFT: 43m long, 550t bridge. CRANE CONFIGURATION: Lift required a 31m long special spreader beam for a load of 650t. The weight of the rigging equipment alone was 70t. An ‘integrated stinger’ fitted to the superlift of the 1,600t crawler crane enabled the fast changes of the load.

WHO: Max Cranes WHERE: Client was Santos, Cooper Basin, Queensland. WHAT: 246t absorber CRANES: A 1200t Liebherr LTM11200-9.1 with 202t of counterweight in TY (Superlift configuration) and a 400t Liebherr LTM1400-7.1 with 120t of counterweight also in TY (Superlift) were used to conduct the lift.

WHO: Universal Cranes WHERE: Air Liquide at Incitec Pivot on Gibson Island. CRANES: Grove GMK 7450 with 25.7m of main boom and 120t of counterweight. Demag AC350 – 6 27.2m of main boom and 116.7t of counterweight. LIFT: Dual crane lift of two CO2 vessels. Each weighed 125t on the plan and were 34m long with a diameter of 4.5m.

WHO: West Cranes and Access Hire WHERE: Victorian wind farm LIFT: 42m long 30 tonne wind turbine blade. CRANE: Humma 55.

90 / CAL November 2021

www.cranesandlifting.com.au


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Working at Heights Association

5min
pages 88-89

Lift of the month

1min
pages 90-92

Universal pressure lift

5min
pages 84-87

New Valla pick and carries arrive

5min
pages 82-83

Sany crawlers

3min
pages 80-81

New Kobelcos for piling work

5min
pages 77-79

Service and support from Altra Motion

7min
pages 70-72

Importance of the right insurance policy

11min
pages 73-76

Forensic testing extends life of wire rope

6min
pages 65-67

Liebherr delivers hammer head for infrastructure project

5min
pages 68-69

Townsville steps up in capacity

8min
pages 60-64

New Kato city crane to Pfeiffer Cranes

7min
pages 56-59

Keeping pace with sustainability

5min
pages 42-44

Australian technology built tough

3min
pages 54-55

Flexibility key to Franna’s success

6min
pages 45-47

Five axle Groves continue to deliver

5min
pages 51-53

Benefits of manufacturing locally

6min
pages 38-41

Ben Baden Services deliver quality truck mounted crane

7min
pages 48-50

Complex turbine lift test

7min
pages 34-37

Booming result

6min
pages 32-33

CICA President’s Report

5min
pages 14-15

CICA Tech Corner

5min
pages 20-21

Up Front

12min
pages 10-13

How safe is crane signage?

6min
pages 28-31

CICA Member Profile

7min
pages 16-19

Liebherr to serve ADF

3min
pages 26-27

Celebrating with Humma

7min
pages 22-25

Industry news

3min
pages 6-9
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.