6 Lines of action for the 15 minutes city - Sesto Marelli

Page 32

2.2 Pathway to achieving a 15 Min city SESTO FOR THE 15 MINUTES CITY

6 LINES OF ACTION FOR THE 15 MINUTES CITY

1_PEDESTRIANISING - Make roads more pedestrian friendly - Create open public squares in the underused streets’ spaces - Make one of the underpasses just for slow mobility and pedestrians 2_DESATURATING - Create 10km/h or no car zones - Remove car parks on the main roads - De pave some parts of the roads’ system 3_CONNECTING - Create slow mobility paths on the main roads and on the inside of the dense urban fabric and connect them to the already existing ones - Add some bus stops in under served areas - Up the sharing mobility nodes 4_INTERACTING WITH THE GREEN AND BLUE SYSTEM - Create a green corridor connecting Parco Nord, Parco lambro, Cascina Gatti, the upcoming parco milanosesto and the lambro river - Up the quality of green spaces and make use of the green service areas randomly scattered on the urban fabric 5_REHABILITATING PUBLIC SPACE - Up the quality of the already existing public squares and the social nodes - Beautify the neighbourhood - Add urban lighting to the public spaces - Create multifunctional public spaces for the whole day, mostly around schools 6_SPREADING WELFARE - Create co working spaces and skill development areas for unemployed population - Create a start up hub - Up the offer of basic services such as grocery shops and make them more accessible for the elderly population 32


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.