Stage 2 Envision
Close collaboration with community members to design the project to best suit their values and needs while beginning fundamental elements of the project build
‘WASH’ Education
Light-weight Bamboo Shade Structure
Initial Planting: Soil Refurbishment (Nitrogen fixing trees)
Educational Workshopping & Collaborating Construct Urine-Diverting Dry Toilet (UDDT) (Fertilizer Production)
Urine: 1000L Underground airtight storage with hand pump (>6 month storage) Faeces: Dry composted over <1 year and used as soil conditioner
26