Plains to School: A Conceptual Shared Use Path for Easthampton Students and Residents

Page 8

Currently, the only contiguous pedestrian route that connects the Plains to other parts of Easthampton is the sidewalk on Park Street. Residents who don’t feel comfortable walking or cycling alongside cars have very limited options for traveling to and from the Plains without using a car themselves. Creating a new shared-use path away from vehicle traffic will dramatically improve people’s ability to come and go from the Plains without relying on motorized transportation.

Right: yellow numbers indicate the number of times streets in the Plains were reported as unsafe or uncomfortable by survey respondents.

CONNECTIVITY PAGE TITLE

The City of Easthampton aims to improve walking and cycling infrastructure within the Plains. The 2017 Complete Streets Prioritization Plan calls for the construction of new sidewalks on Plain Street, Strong Street, Phelps Street and Pomeroy Street, as well as a bike lane on Line Street and Park Street.`

6

Galen Hammitt | Walker Powell | The Conway School

While most of the secondary streets within the Plains have sidewalks, none of the main roads do except for Park Street and Line Street. There are no designated bike lanes within the Plains. In a survey conducted to gather community feedback on the experience of walking and biking in the Plains, residents reported that the quieter roads with sidewalks are pleasant to use, but the main roads feel unsafe due to the lack of sidewalks, the heavy traffic, and speeding drivers. The roads that were most frequently cited as being unsafe or uncomfortable are Park Street (even though it has a sidewalk), Plain Street, Strong Street, and Hendrick Street.

Prepared for the City of Easthampton | Spring 2020

Pedestrian and Bicyclist Infrastructure

PLAINS TO SCHOOL: A Shared-Use Path for Easthampton

CONNECTIVITY


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

NEXT STEPS AND FUTURE CONNECTIONS

3min
page 31

FINAL DESIGN DETAIL: River Valley Way

0
page 24

MATERIALS AND PRECEDENTS

3min
page 30

FUNDING SOURCES

2min
page 29

FINAL DESIGN DETAIL: Nonotuck Park Connection North

1min
page 26

FINAL DESIGN DETAIL: Park Street Spur

0
page 28

FINAL DESIGN DETAIL: Park Street Trailhead

1min
page 27

FINAL DESIGN DETAIL: Fill Site

2min
page 22

FINAL DESIGN DETAIL: Chicoine APR

1min
page 20

FINAL DESIGN DETAIL: Plain Street Parking

2min
page 19

FINAL DESIGN DETAIL: Plain Street

1min
page 18

FINAL DESIGN: Shared-Use Nature Path

1min
page 17

DESIGN ALTERNATIVES

2min
page 15

COMMUNITY ENGAGEMENT

3min
page 16

SUMMARY ANALYSIS

1min
page 14

REGIONAL VEGETATION AND WILDLIFE

2min
page 12

CONNECTIVITY

1min
page 8

HYDROLOGY

1min
page 9

NEIGHBORHOOD VEGETATION AND WILDLIFE

3min
page 13

INTRODUCTION

3min
page 3

HISTORICAL CONTEXT

2min
page 5

PHOTO TOUR: NORTH

1min
page 7
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.