Destination McDowell - Tourism Master Plan

Page 76

PROJECT B.2 WILDERNESS GATEWAY TRAIL The planned Wilderness Gateway State Trail (WGST) stretches approximately 170 miles and will connect Rutherford, McDowell, Burke, and Catawba Counties. Within McDowell County the trail connects privately conserved lands between the northwest corner of Rutherford County and South Mountains Game Lands and State Park. Approximately 35 miles of the trail is proposed in McDowell County. B.2.1 Partnerships and Planning

where the trail crosses US Highway 64, US Highway

plans to contract construction of that segment of trail.

The Foothills Conservancy of North Carolina (FCNC)

221, Brackett Town, and Rhom Town Roads.

East of US Hwy 64 the WGST is co-aligned with the OVNHT as it proceeds north towards Burke County.

continues to work with a private conservationist to secure a land corridor for the length of the trail within

ACTION ITEMS:

McDowell County. Approximately 17,335 acres have

Develop and implement trailheads and support

ACTION ITEMS:

currently been conserved. The US Fish and Wildlife

facilities at locations where the WGST intersects

Service (USFWS) plans to include these lands in the

with the OVNHT near US Hwy 64 and the Peavine

and OVNHT from US Hwy 64 to the north and

Mountain Bogs National Wildlife Refuge Box Creek

Connector Trail near US Hwy 221.

east as outlined in the OVNHT: Morganton to

Support implementation of the co-aligned WGST

Rutherfordton Master Plan.

Conservation Partnership Area. While a high level plan •

Work with partners to acquire easements/land

for the WGST was completed by the NC Division of

B.2.3 Trail Implementation

Parks and Recreation, additional planning focused on

Approximately 35 miles of planned WGST is located

from willing landowners, design, and construct a

McDowell County would be beneficial.

within McDowell County, and 30 miles has been

sustainable trail alignment within the planned and

designed and laid out to connect US Hwy 221 and US

secured corridor.

ACTION ITEMS: •

Hwy 64. Once funding is secured, Foothills Conservancy

Participate in planning and development of a Wilderness Gateway State Trail master plan that

US HWY 64 TRAILHEAD

focuses on a conceptual trail alignment and parcel acquisition within the County. wilderness gateway state trail

RESTROOM AND KIOSK

cree k

Participate in planning and development of branding, signage, wayfinding, and trail support facility plans to unify planned trailheads.

kelly

cane

bran

ch

with the Overmountain Victory National of McDowell County as it crosses US Hwy 64 and heads north. The US Hwy 64 trailhead will serve both the WGST and OVNHT. Key

us-6 4

The FCNC is also working on trailhead development and

features at the trailhead include parking for

mowed grass loop through meadow

24 typical vehicles, 2 ADA parking spaces,

efforts should focus on areas where state trails and connectors coalign to leverage funding and maximize

wilderness gateway state trail

floodplain

entry sign

entry sign, kiosk, bathroom, and short nature trail. Trailhead development will require

benefits. Current planning efforts propose trailheads 1=60'

overmountain victory trail 0

68 — Recommendations

The Wilderness Gateway State Trail co-aligns Historic and State Trail in the southeast corner

24 typical parking spots 2 ada parking spots

B.2.2 Trailheads trail implementation. MCTDA trailhead development

EXH 20

30

60

N

approval by the USFWS. DESTINATION MCDOWELL TOURISM MASTER PLAN


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

C. Old Fort Trails Project Overview

1min
pages 166-167

A. Destination McDowell Fact Sheet

2min
page 164

EXHIBIT 71: ORCHARD AT ALTAPASS MASTER PLAN

0
pages 145-147

EXHIBIT 69: LYNN GAP TRAILHEAD

1min
page 142

IMPROVEMENTS AND PEDESTRIAN CONNECTOR

0
page 141

EXHIBIT 70: MINERALS MUSEUM TRAILHEAD

1min
pages 143-144

MAP 08: LITTLE SWITZERLAND AREA PROJECTS

1min
pages 139-140

EXHIBIT 66: CURTIS CREEK TRAILHEAD

1min
page 136

EXHIBIT 63: NORTH CATAWBA AVENUE RENDERING

0
page 133

EXHIBIT 62: COMMERCE STREET RENDERING

0
page 132

AVENUE CROSSINGS

0
page 115

EXHIBIT 50: GEORGIA STREET CROSSING

0
page 116

EXHIBIT 48: STATE STREET RENDERING

0
page 114

EXHIBIT 52: BALDWIN STREET RENDERING

0
page 118

EXHIBIT 54: MCDOWELL HOUSE RENDERING

0
page 121

EXHIBIT 51: BALDWIN AVENUE CROSSING

0
page 117

EXHIBIT 53: MARION STREET CROSSING

1min
pages 119-120

EXHIBIT 46: PEAVINE STUDY AREA

0
page 112

AND SIGNAGE

0
page 111

INTERIOR IMPROVEMENTS

0
page 108

EXHIBIT 36: W. HENDERSON GATEWAY STREETSCAPE

0
page 102

EXHIBIT 37: WEST HENDERSON STREET STREETSCAPE

0
page 103

EXHIBIT 41: DREXEL PROPERTY

0
page 107

EXHIBIT 38: WEST HENDERSON STREET RENDERINGS

0
page 104

EXHIBIT 40: LOGAN STREET RENDERING

0
page 106

EXHIBIT 35: MARION STUDY AREA

0
page 101

MAP 06: MARION AREA PROJECTS

1min
pages 97-100

EXHIBIT 32: OLD FORT GATEWAY SIGN - NCSTEP PLAN

1min
page 90

WONDERLAND

2min
pages 91-92

MAP 05: COUNTY-WIDE WAYFINDING

0
pages 87-88

EXHIBIT 26: OLD FORT TRAILS PROJECT MAP

0
page 83

EXHIBIT 25: FRIENDS OF MOUNTAINS TO SEA TRAIL

1min
page 82

EXHIBIT 24: OVNHT CONNECTOR

0
page 81

ASSOCIATION (OVTA

1min
page 80

SEGMENT 3

2min
pages 77-78

EXHIBIT 19: BLACK BEAR TRAILHEAD

0
page 75

STATE TRAIL (F3ST

2min
page 74

EXHIBIT 20: US HWY 64 TRAILHEAD

2min
page 76

EXHIBIT 16: PHILLIPS LANDING ENTRANCE SIGN

3min
pages 68-70

MCDOWELL COUNTY

1min
pages 65-67

4.1 County-wide Connections Tourism Area

0
pages 62-63

3.3 Community Survey

1min
pages 56-57

3.4 Emerging Themes and Guiding Principles

2min
pages 58-61

EXHIBIT 13: PUBLIC ENGAGEMENT

0
pages 52-53

3.1 Tools of Engagement

1min
pages 48-49

OUTDOOR RECREATION

0
pages 54-55

3.2 Community Partners

0
pages 50-51

EXHIBIT 12: MCDOWELL ARTS COUNCIL ASSOCIATION

1min
pages 45-47

EXHIBIT 10: MARION

1min
pages 40-43

EXHIBIT 09: OLD FORT

0
page 39

EXHIBIT 08: LITTLE SWITZERLAND

0
page 38

EXHIBIT 06: STATE TRAILS

2min
pages 34-35

RECREATION BUSINESS CASE STUDIES

1min
pages 36-37

EXHIBIT 05: CATAWBA FALLS

0
page 33

EXHIBIT 04: POINT LOOKOUT TRAIL

1min
page 32

EXHIBIT 03: CATAWBA RIVER

0
page 31

1.1 Project Background

1min
page 10

EXHIBIT 02: PISGAH NATIONAL FOREST

0
page 30

2.3 Previous Planning Efforts

6min
pages 22-25

1.4 Plan Organization

1min
pages 14-17

1.2 Project Goals

1min
page 11

2.4 Asset Inventory

3min
pages 26-28

1.3 Planning Process

1min
pages 12-13

2.1 Regional Context

2min
page 18
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.