El Monte Vision Zero Action Plan

Page 107

Implementation

06

Table 6-10: Tyler Avenue Countermeasure Concept Costs COUNTERMEASURE

DESCRIPTION

UNIT COST

UM

QUANTITY LENGTH

WIDTH

COST

Concrete or Pavement Construction (low cost options use pavement markings) Corner Radius Reduction or Truck Apron

Concrete curbs and sidewalk

$15,000

EA

8

$120,000

Bulb Out / Turn Wedge

Pavement markings with ‘buttons’ and rubber turn wedges

$2,500

EA

7

$17,500

High Visibility Crosswalks

Continental spaced to avoid vehicle wheels

$5,500

EA

6

$33,000

Bicycle Priority Lanes

Bicycle lane centered in lane, filled with thermoplastic

$100

LF

1

Add NoRTOR sign / display

Sign attached to existing signal structure

$500

EA

4

$2,000

Electronic Feedback Signs

Speed reader board on post (solar)

$8,000

EA

2

$16,000

Street Lighting

Fixture and power lines as needed

$8,000

EA

10

$80,000

Adjust signal timing in Traffic Control Cabinet

$1,500

INT

3

$4,500

Pavement Markings 1,200

$120,000

Signs or Signal Infrastructure

Signal Timing Adjustments Signal Changes at Intersections

INT = Intersection, Qty = Quantity, L = Length, W = Width, EA = Each, SF = Square Feet, LF = Linear Feet

Existing roadway conditions along Tyler Avenue

Total

$393,000

Intersection of Tyler Avenue and Ramona Boulevard

95


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.