ON BACALAR'S DEFENSE. COLLOQUIAL VERSION

Page 137

Sustainable Development Goals (SDGs) of the United Nations. Which implied that the previous model, which was used and pretexted by the NAPs and Ramsar sites, was NOT working. In this frame of reference, PROTUR emerged. PROTUR was now protected by the Secretary of Tourism in charge of Marisol Vanegas Pérez and the then Secretary of the Environment of the state of Quintana Roo, Alfredo Arellano Guillermo. The Consultant was Geoalternative, led by Silvana Ibarra Madrigal, who had been involved as a public official for the government of Jalisco in charge of Ramsar sites and at the same time as part of a consulting company for the government itself, and had the approval and open support of the municipality of Bacalar, through the Director of Municipal Ecology, Romel Cano Alvarez, who became actively involved. As an additional comment, the same actors that promoted PROTUR built another parallel instrument in 2019: Water Sensitive Territory in Quintana Roo (also built with Geoalternative) according to the then Secretary of environment of Quintana Roo, it was a planning scheme based on the underground aquifer, which flowed into the lagoon of the seven colors, which is the basis of the tourist development of the municipality and they intended to include it in the regulations. The document specified that some guidelines of water-sensitive territories were being incorporated into the Territorial Planning of Bacalar, which made it an innovative planning method, which would be setting an example at the state level and mainly for the Yucatan Peninsula. But the Territorial Ecological Planning of Bacalar was still under review (since 2011), the Urban Development Program (PDU) was being built since the foundation of the municipality, almost 10 years before, and was not being built in a real participatory way, but through a cabinet consultancy, and despite all the demands of the community to update this instrument, nor had it produced a revision and a decree. There were many contradictions in the way it was handled and many procedural shortcomings of PROTUR. The justification for PROTUR is quoted from page 36 of the document itself: “…Justification of PROTUR

119


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Demystifying Stromatolites

2hr
pages 221-304

The myth of tourism and tourism in PNA, pro-poor

9min
pages 215-220

The colonialist myth of the petty or ignorant local inhabitant

16min
pages 190-198

The myth of Carrying Capacity for Tourism

24min
pages 199-211

The Acceptable Change Limit

5min
pages 212-214

Bacalar

5min
pages 186-189

The myth of the lack of regulation of the Bacalar Lagoon and its basin Hundreds of instruments to regulate and over-regulate almost everything in

3min
pages 184-185

IBANQROO and PROTUR

31min
pages 162-183

"Innovative" strategies that put the lagoon and user safety at risk

16min
pages 153-161

Unexplained zoning criteria

6min
pages 148-150

50% of the Lagoon in Conservation or only for Research

1min
page 152

Subzone 5.1 Microbialites of Buenavista

1min
page 151

The Unexplained Calculation of Load Capacity and Acceptable Change Limit

10min
pages 142-147

SWOT without feet or head

1min
page 141

Participatory construction simulation

8min
pages 137-140

The Master Plan for Sustainable Tourism of Quintana Roo 2030

10min
pages 131-136

The PNA Management Program does not solve the problems

4min
pages 127-130

Who benefits from PNAs?

7min
pages 123-126

Rule 23. The CONCCLAB in APIQROO

7min
pages 70-73

The failed PNA, in Quintana Roo

1hr
pages 81-117

The Secretary of the Navy and APIQROO

10min
pages 74-80

2011 – 2014 RAMSAR. 97,591 hectares for the triad

25min
pages 53-67

Bacalar’s PNA propposal

9min
pages 118-122

ECOSUR and IEUNAM, in APIQROO

1min
page 68
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.