kwik-ZIP gets the show on the road In early 2022, kwik-ZIP HDXT-43 spacers were used to complete a project for Highways England near Birmingham Airport, where they provided an efficient and seamless solution for bunding together HDPE pipe.

T

he kwik-ZIP HDXT Series is an anticorrosion, non-metallic casing spacer range for pipe-in-pipe (PIP) applications such as slip lining and cased crossings. Suitable for heavy-weight pipe materials including steel, ductile, mild steel cement lined (MSCL), glass reinforced epoxy (GRE), polyvinyl chloride (PVC) and high-density polyethylene (HDPE), it can be used on all diameters from 300 mm and beyond through the simple addition of multiple segments. Kwik-ZIP HDXT-43 spacers were recently used on a project for Highways England on a M42 J6 diversion in Birmingham. UK-based infrastructure services and engineering company Amey used the spacers to facilitate the slip-lining of a four-pipe bundle. Junction 6 of the M42 connects the M42 motorway to the A45 to the east of Birmingham, where road users suffered significant delays and due to capacity constraints. The M42 J6

Kwik-ZIP HDXT-43 on a 4-pipe HDPE bundle.

Diversion Project was designed to alleviate some of these delays experienced by motorists. The 4-pipe bundle consisted of 2 x DN 180 HDPE and 2 x DN450 HDPE pipes with a run length of 135 m. Kwik-Zip spacers were selected for this project due to their ability to secure the 4-pipe bundle together; their suitability to work with any pipe profile; and their design that protects and supports the bundle during the sliplining process. Kwik-ZIP’s large range of spacers caters for a wide range of carrier and casing pipe size

THE SMART WAY TO REPAIR PIPELINE FAULTS. Smart Lock is the biggest advancement in point repair technology, in more than 15 years.

For more information visit smartlockgroup•com

30 TRENCHLESS AUSTRALASIA APRIL 2022

combinations, as well as providing flexibility to deal with project alterations. Kwik-ZIP spacers have no metal parts and are made from Kwik-ZIP’s engineered thermoplastic blend that is flexible, extremely tough and has a low coefficient of friction. Amey site manager on the M42 J6 Diversion Project Tim Lohoff commended kwik-ZIP for the intuitive design and ease of use of the spacers, which helped the project to come to fruition. “The spacer system was easily installed and was an excellent aid in slip lining the 4-pipe bundle through the tunnel, which we had installed prior to slip lining works – a truly excellent product,” says Lohoff. For more information on kwik-ZIP products and to discuss your specific project requirements, contact the team at sales@kwikzip.com

With Smart Lock, you can seal redundant lateral connections and repair cracked or damaged pipes in three easy steps, completed in only 30 minutes. LOAD Smart Lock into position using the packer

LOCK Smart lock into place with the intelligent ratchet system

LEAVE Completed in under 30 min so you can move to the next job


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

No-Dig Down Under

4min
pages 58-59

AI in the water sector: Safer, faster, better

2min
page 57

L&D purchases new high-power vac truck

3min
page 56

Providing cost-effective repair solutions

3min
pages 50-51

Wilmot Pipelining commits to customer service

1min
page 54

Thinking outside the box

5min
pages 52-53

A powerful drilling solution for tight, narrow job sites

4min
pages 46-47

Case study: Smart Lock restores badly damaged GWM Water network

4min
pages 48-49

S&Z Australia support North East Link early works

2min
pages 44-45

Larger and longer: TRACTO drill facilitates contractor’s biggest installation

5min
pages 42-43

Powerful pumps – the heart of HDD maxi-rig spreads

5min
pages 40-41

Vermeer HDD a fab addition for Irrifab

3min
pages 38-39

Ditch Witch CEA maximises profit and performance

2min
pages 34-35

kwik-ZIP gets the show on the road

2min
page 30

Sydney’s forgotten ghost tunnels all powered up with guided boring breakthrough

3min
pages 36-37

Adept completes bore for Sunbury Line

2min
page 31

Finding financing deals quickly and efficiently

3min
pages 32-33

Yarra Valley Water completes Doreen to Diamond Creek Sewerage Project

2min
pages 28-29

Carbon Calculator key to reducing trenchless industry emissions

5min
pages 20-21

From the President

2min
pages 10-11

From the ASTT Secretary

1min
pages 12-13

SECA promotes emissions reductions with the eCityJet electric jetting machine

3min
pages 26-27

The key to long-lasting plastic pipes and fittings

4min
pages 24-25

Rob Carr continues to take steps to reduce carbon footprint

4min
pages 22-23

Editor’s letter

3min
pages 8-9

Building for a better future

6min
pages 18-19
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.