Rumoer 72: Kit-of-Parts | Bout | Tu Delft

Page 20

72 | Kit-of-Parts

Interview with ir. Ronald Schleurholts

cepezed KoP Methodology by Fredy Fortich

Š cepezed | Lucas van der Wee

Kit of Parts is an object-oriented construction approach coordination

which

requires

between

integration

architects,

and

engineers,

manufacturers and builders for the most efficient and cost-effective design. This can also be understood as a pool of different building elements where every element is optimized for production, assembly and disassembly.

20

1. How would you define the kit of parts? Does cepezed understand the concept as described in the introduction? Working with kits of parts is in the DNA of our office, it is our building methodology from the very beginning. The cepezed office was started in the 1970s by three students that decided to take on projects. Their main aim was to professionalize the building industry, making something valuable and of high quality. We believe we should keep the building process away from the building site as much as possible and prepare parts and segments in the factory as much as possible.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.