The Builders Choice June 2021

Page 58

PEEL HEALTH CAMPUS

THE BUILDERS CHOICE Peel Health Campus

State-of-the-Art Healthcare Major Hospital Campus Upgrade in Mandurah

W

ith healthcare becoming even more crucial in this challenging and rapidly evolving era, Peel Health Campus commissioned Hames Sharley as the architect for a major refurbishment at the Mandurah Campus – resulting in an overall better patient experience. THE TEAM

Phone: 9381 0200 www.devlyn.com.au

Phone: 9456 9456 www.hamessharley.com.au

58 The Builders Choice Magazine – June 2021

The work was carried out by Devlyn Construction, industry leaders in commercial development projects. Their extensive experience in medical construction, and reputation for delivering a high level of quality and meticulous attention to detail, was especially important in the Peel Health Campus upgrade. The project involved staged redevelopment works to the emergency department and short-stay admission ward, as well as the server room. These works were carried out while both areas were kept operational. As access was limited, a scaffold was set up over the top of the building, with a hoist for material to minimise disruption to the hospital’s operations. Each area was hoarded off to create a construction zone, and the relevant areas were fully demolished internally and rebuilt to current healthcare design standards. Specifically, the work comprised a full upgrade of the machinal, electrical, comms and nurse call, and a new consultation room, waiting room and reception area.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.