160 Burwood Rd Concord Amended PP v5

Page 44

Access and Movement The internal movement network will increase the overall permeability and accessibility within the site and to other local networks. Public access movement along the foreshore (east west) and north south avenue completes a green loop around Concord that connects a sequence of open space with Concord (Majors Bay Road) local centre. Pedestrian networks are a key focus of the revised Concept Plan and include:  Defining a new public access street network that knits the site into the existing community.  Providing a highly permeable network for pedestrian and cycle pathways through the site allowing access from Burwood Road to the foreshore.  Scale of streets for pedestrians comfort and for local traffic.  Providing a through-site link to enhance the Hen and Chicken Bay Foreshore Walk which is a green grid corridor identified as important in Council's foreshore strategy.  Providing connectivity to the existing surrounding street network including bus stops for routes connecting to high frequency train stations of Burwood and Strathfield, as well as the potential connection to future Sydney Metro West Station(s).  Providing car parking in response to sustainability initiatives whilst meeting anticipated demand.

Figure 15: Access and Movement (Source: Roberts Day)

42

160 Burwood Road, Concord Bushells Redevelopment - Amended Planning Proposal v5-1 | LFA (Pacific) Pty Ltd


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Table 7: Canada Bay Local Strategic Planning Statement

30min
pages 71-91

Part 6 – Project Timeline

6min
pages 109-112

Table 9: Consistency with relevant Section 9.1 Directions

28min
pages 93-106

Table 8: Consistency with relevant SEPPs

1min
page 92

Table 6: Consistency with Canada Bay Local Planning Strategy 2010-2031

3min
pages 69-70

Table 5: Summary Strategic Merit Assessment

1min
page 68

Table 4: Consistency with the Eastern City District Plan

4min
pages 65-67

Figure 28: Proposed Foreshore Building Line Map

2min
pages 53-54

Figure 17: Public Realm (Source: Roberts Day

1min
page 46

Figure 13: Proposed Public Domain and private open space (Source AJ+C /BVN

1min
page 42

Figure 12: Concept Plan - Potential Activities (Source: Roberts Day

1min
page 41

Figure 15: Access and Movement (Source: Roberts Day

1min
page 44

Figure 16: Urban Structure (Source: Roberts Day

0
page 45

Part 1 – Objectives or Intended Outcomes

2min
page 39

Figure 9: CBLEP2013 Heritage Map

11min
pages 33-38

Executive Summary

14min
pages 7-13

1.3 Supporting Documentation

1min
page 20

1.2 Structure of the Report

1min
page 19

2.3 Surrounding Development

1min
page 24

3.1 Strategic Planning Context

6min
pages 25-27

Figure 5: LSPS Structure Plan

4min
pages 28-29

1.1 Background

12min
pages 14-18

Figure 6: CBLEP 2013 Land Zoning Map

1min
page 31
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.