Employment Land Strategy Background Paper

Page 63

Table 21: Industrial lands future lands needs assessment (2021-2041) Net increase (sqm)

Precinct Low Ashby working waterfront Goodwood island - working waterfront Harwood island industrial Harwood island working waterfront

Medium

Net demand for land (ha)

High

Low

Medium

High

0

0

0

0.0

0.0

0.0

107

142

185

0.0

0.0

0.1

69

138

218

0.0

0.0

0.1

279

538

845

0.1

0.2

0.3

Harwood island working waterfront, River St

0

0

0

0.0

0.0

0.0

Ilarwill industrial

0

0

0

0.0

0.0

0.0

3,035

4,129

5,473

1.0

1.4

1.8

Iluka waterfront

615

826

1,086

0.2

0.3

0.4

Junction Hill industrial

465

1,227

2,125

0.2

0.4

0.7

12,982

18,264

24,694

4.3

6.1

8.2

5,957

8,829

12,299

2.0

2.9

4.1

25,675

40,189

57,643

8.6

13.4

19.2

4,327

6,577

9,292

1.4

2.2

3.1

333

482

662

0.1

0.2

0.2

9,605

13,406

18,042

3.2

4.5

6.0

0

0

0

0.0

0.0

0.0

63,449

94,745

132,564

21

32

44

Iluka industrial

Koolkhan North Grafton South Grafton industrial Townsend industrial Tyndale industrial Yamba industrial Yamba waterfront Total Source: HillPDA

7.6

Industrial lands capacity gap assessment

A capacity gap assessment has been completed for the Clarence Valley LGA. Clarence Valley is projected to require a total of between 21 and 44 hectares of appropriately zoned industrial land to accommodate its forecast floorspace demand. Currently Clarence Valley contains approximately 111 hectares of land that is zoned for industrial purposes and is currently identified as being vacant land. However, the suitability of that land for development is mixed, with some land being constrained. HillPDA undertook a high-level constraints assessment to better understand the amount of vacant land that is unconstrained and considered available for development. This assessment excluded land which was either flood prone, not serviced by water or sewer services, powerlines, environmentally sensitive or its typography is unsuitable for industrial development. This assessment found that of the 111 hectares of vacant land, around 56 hectares or 50% was not constrained and considered available for development. The amount of constrained and non-constrained vacant land stocks for each employment can be seen in Table 22.

P22016 Clarence Valley Employment Lands Background

63 of 98


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Table 33: Capacity GAP assessment by commercial centre (negative number indicates shortfall in capacity Table 34: Selected constraints and opportunities identified during the Clarence Valley Roundtable, 28 October 2021 .......................................................................................................................................... 81

9min
pages 78-81

Table 32: Total retail and commercial space demand by centre and growth scenario 2021-41 (sqm

2min
pages 76-77

Table 30: Net demand for commercial jobs and resulting space by scenario

2min
page 73

Table 35: List of stakeholders for targeted engagement

12min
pages 82-92

Table 25: Household expenditure by broad category and small area

1min
page 68

Table 28: Assumed capture of visitor expenditure by small area

5min
pages 70-71

Table 29: Occupied retail space demand by commercial centre and growth scenario 2021-41 (sqm

0
page 72

Figure 16: Summary of industrial land requirements under each demand scenario

1min
pages 65-66

Table 22: Constrained and non-constrained vacant land stocks (ha

1min
page 63

Table 21: Industrial lands future lands needs assessment (2021-2041

2min
page 62

Table 15: Commercial precincts

1min
page 54

Table 18: Net additional employment directed towards industrial precincts 2020-41

1min
page 59

Table 11: Clarence Valley employment projections

1min
page 47

Figure 11: Precincts and locations

0
page 48

Figure 12: Total employment space by employment precinct (sqm

1min
page 51

Figure 10: Industry value added by industry 2019/20 ($m

1min
page 46

Table 3: Annual median dwelling sale price growth rate 2018-21 (March quarter

12min
pages 15-20

Table 8: Clarence Valley population projections

4min
pages 40-41

Table 5: Resident employment location quotation

1min
page 38
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.