Implementation
06
Table 6-2: Durfee Avenue Countermeasure Concept Costs COUNTERMEASURE
DESCRIPTION
UNIT COST
UM
QUANTITY LENGTH
WIDTH
COST
$20,000
EA
1
$20,000
Concrete or Pavement Construction (low cost options use pavement markings) Crossing Island
Concrete curbs and sign(s)
Bulb Out / Turn Wedge
Pavement markings with 'buttons' and rubber turn wedges
$2,500
EA
9
$22,500
High Visibility Crosswalks
Continental spaced to avoid vehicle wheels
$5,500
EA
6
$33,000
Bicycle vs Vehicle Conflict Markings
Green w/ white edges, 50 ft length
$6,000
EA
8
$48,000
$198,000
EA
2
$396,000
Pavement Markings
Signs or Signal Infrastructure Pedestrian Signal - New
Mast, power, concrete median, crosswalk
INT = Intersection, Qty = Quantity, L = Length, W = Width, EA = Each, SF = Square Feet, LF = Linear Feet
Pedestrian crossing mid-block on Durfee Avenue at Legore Elementary School
Total
$519,500
Existing bicycle lane on Durfee Avenue
81