El Monte Vision Zero Action Plan

Page 93

Implementation

06

Table 6-2: Durfee Avenue Countermeasure Concept Costs COUNTERMEASURE

DESCRIPTION

UNIT COST

UM

QUANTITY LENGTH

WIDTH

COST

$20,000

EA

1

$20,000

Concrete or Pavement Construction (low cost options use pavement markings) Crossing Island

Concrete curbs and sign(s)

Bulb Out / Turn Wedge

Pavement markings with 'buttons' and rubber turn wedges

$2,500

EA

9

$22,500

High Visibility Crosswalks

Continental spaced to avoid vehicle wheels

$5,500

EA

6

$33,000

Bicycle vs Vehicle Conflict Markings

Green w/ white edges, 50 ft length

$6,000

EA

8

$48,000

$198,000

EA

2

$396,000

Pavement Markings

Signs or Signal Infrastructure Pedestrian Signal - New

Mast, power, concrete median, crosswalk

INT = Intersection, Qty = Quantity, L = Length, W = Width, EA = Each, SF = Square Feet, LF = Linear Feet

Pedestrian crossing mid-block on Durfee Avenue at Legore Elementary School

Total

$519,500

Existing bicycle lane on Durfee Avenue

81


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.