Trenchless Australia December 2021

Page 38

HDD

The Vermeer D23x30 S3 Navigator® is the most popular drill on the market, and is now also available in a Dual Rod configuration.

Vermeer proudly supporting WA’s underground power project The State Underground Power Project (SUPP) was established in the early 1990’s after severe storm damage caused major power outages across the populated South West region of WA.

T

he program, a partnership between the state government and local governments, is now in round six, replacing overhead power lines with a safe and reliable underground network. Vermeer Equipment of WA & NT has been supplying horizontal directional drills (HDD) involved in the project since the early 1990s. These include trusted models such as the D14/24P, as well as the new market-leading D23x30S3. Vermeer continues to support WA contractors involved in the

replacement of overhead power lines in established areas with a comprehensive range of HDD equipment. An extensive product range Vermeer Equipment of WA & NT supplies SUPP contractors with a variety of products suited for small service installations. These products are also extensively used for gas, power, water and telecommunication networks. The innovative Vermeer D8x12 Navigator® is the smallest HDD on the market and is perfectly suited for mini pillar service crossings. Being 3.5 metres in length, the HDD can be easily set up on a suburban street verge. The HDD provides contractors the power of a large drill combined with the compact body and enhanced performance of a small drill, easy to use controls, a narrow footprint and reduced sound disruption. The narrow-bodied Vermeer D20x22 S3 Navigator® is well suited for DCI project map.

38 TRENCHLESS AUSTRALASIA DECEMBER 2021


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Masters in micro tunnelling deliver peninsula project amid trying times

2min
page 57

kwik-ZIP spacers - the only Australian-owned spacer on the market

3min
pages 58-59

Rob Carr awarded next stage of Melbourne CBD sewer upgrade

2min
page 56

The preferred rehab technology of municipalities and utilities

2min
pages 54-55

Pushing to become the best strategic supplier: KOR 10 years on

5min
pages 50-51

Vacuum excavation that’s portable and quiet

3min
pages 52-53

Trenchless contractor delivers complete package

3min
pages 48-49

IMPREG prepares for the future of CIPP

2min
page 47

Wilmot Pipelining delivers the largest UV liner installation

1min
page 46

The perfect rehabilitation solution for sewer, stormwater gravity mains

3min
pages 44-45

Maxibor grows its maxi-rig fleet

4min
pages 36-37

Thirty years of trenchless technology for Vermeer Australia

3min
pages 34-35

Learning today for tomorrow

4min
pages 42-43

Prime Drilling supporting compact HDD rigs with customisation and knowledge

4min
pages 40-41

Vermeer proudly supporting WA’s underground power project

3min
pages 38-39

Austeck introduces revolutionary inspection system

3min
pages 32-33

APM chooses Quick-Lock for seamless sewer repairs

2min
pages 28-29

News in brief

5min
pages 14-17

From the ASTT Secretary

3min
pages 12-13

Hunter Water embraces Primus Line pipe relining technology

4min
pages 30-31

Rangedale expands civil division

3min
pages 26-27

Celebrating 85 years of innovation with Interflow

4min
pages 18-19

Trenchless bounces back in WA

8min
pages 20-25

From the President

2min
pages 10-11
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.