Project Cycle Report: Infrastructure Project

Page 135

MUMBAI METRO LINE 3

             

.

architectural parts necessary to describe design condition and methods of application and construction. elevations and perspectives and landscaping; layouts and details of structural elements; associated fittings; slopes and earthworks; structural and surface drainage; access roads and temporary road works; pumping systems electrical plant rooms such as UPS, DG set etc.; provisions for railway works, electrical and mechanical services and equipment; existing and proposed utilities; road works and works related to traffic management including decking.

29.3 DESIGN SUBMISSIONS - CONSTRUCTION PHASE On the issue of a Notice in respect of the Construction Reference Draw'ngs the Contractor shall produce the proposed Working Drawings. The ‘Working Drawings shall include the Construction Reference Drawings, which may be supplernented by further drawings developed in accordance w'th the Construction Reference Drawings such as site sketches, bar bending scfedules, bar reference drawings, fabrication and shop drawings, construction erection sequences, finishes material list with accompanying specification, and the like. All such drawings shall comply with the requirements of the Contract. Prior to submission of the proposed Working Drawings, the Contractor shall endorse the appropriate original paper drawings as "Good for Construction". If the Engineer so requires, the endorsed original shall be submitted to the Engineer who shall, if he has no objection to the contents of the submission, further endorse the original by stating that he has no. Equipment on the Permanent ‘Works. This analysis shall be in sufficient detail to demonstrate that the Contractor's proposals are safe and have no adverse-Built Drawings, endorsed by the Contractor, shall be Submitted to Engineer for a Notice of No Objection in accordance with GCC and in electronic format using a commercially

SUBMITTED BY: BHUMIKA RAJ UC5316

130


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Figure 83: Closure Of Project Flowchart

1min
page 194

Figure 81: Manpower Status0

0
page 190

Figure 72: Contents Of Mpr

5min
pages 183-185

Figure 71: Weekly Details

2min
page 182

Table 40: Characteristics Detail

1min
page 155

Figure 70: Billing Flowcart

1min
pages 180-181

Table 45: Format Of Snag List

1min
pages 178-179

Figure 62: Segments Location

1min
page 152

Figure 61: Tmt Bars Location

2min
pages 148-149

Figure 55: Codification Example

1min
page 135

Figure 40: Project Package Details

1min
page 74

Figure 31: Flow Chart For Labour License

4min
pages 86-87

Table 30: Cash Outflow

1min
page 78

Table 24: Cost Estimate

2min
page 71

Figure 54: Softwares Used

4min
pages 133-134

Table 32: Cash Outflow For Year 2016-2017

0
page 120

Figure 37: Work Schedule Format

2min
page 64

Table 14: International Protocols

1min
page 62

Figure 11:Mumbai Metro Network

1min
page 36

Table 2: List Of Projects

1min
page 21

Table 11: Funding Pattern Break Up

4min
pages 46-49

Figure 5: Alignment Of Passengers In Suburban Rail

3min
pages 28-29

Figure 13: Funding Breakup

1min
page 43

Figure 14:Flowchart Showing The Formation Of Insititutional Framework By Goi For Carrying Out Approvals

3min
pages 52-53

Figure 33: Bid Document Details

3min
pages 50-51
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.