Project Cycle Report: Infrastructure Project

Page 182

MUMBAI METRO LINE 3 list, in order to receive final payment from the owner.

44 COMPLETION OF PROJECT

This section will cover some or all of the following aspects: HEAD

CONTRACTUAL CLAUSES Insert the following at the end of Sub-Clause 8.7: PG 24 PART 3 GCC AND PCC

Delay Damages

Where the Works are required to be completed within particular Key Dates, as

specified in Part 1, Section IV, this Sub-Clause shall apply to these Key Date completions, and the Appendix LB-1 to Letter of Bid shall include a sum or percentage in respect of each Key Date which represents the damages likely to be suffered by the Employer if the said Key Date is not accomplished within the time prescribed or by any extension granted under Sub-Clause 8.4. Application for Interim Certificates

Replace Sub-Paragraph (c) with: (c) the amount to be deducted for retention shall be ten percent (10%) from the above amounts, until the amount so retained by the Employer reaches the limit of five per cent (5%) of the Contract Price. Replace Sub-Clause 14.9 with the following:

Payment of Retention Money

PG 37 14.9.1 When the Taking-Over Certificate has been issued for the Works, and the Works have passed all specified tests (including the Tests after Completion, if any), the first half of the Retention Money shall be paid to the Contractor. 14.9.2 Promptly after the latest of the expiry dates of the Defects Notification Periods, the outstanding balance of the Retention Money shall be paid to the Contractor. This outstanding balance may also be paid against presentation of a Bank Guarantee for the balance amount by the Contractor to the Employer at the same time as the payment for the first half of the Retention Money.

• Contract closure (current status, estimated final closure date; for ongoing support/maintenance

contracts, refer to who is responsible, renewal periods, costs, etc.) • Financial closure (invoice approvals, payments, financial system transactions, transfer of

remaining funds) • Asset transfer (disposition of hardware, software licenses, furniture, etc.) • Administrative closure (transfer of administrative functions to an in-service support

organization; transfer includes handover of project deliverables to a responsibility center) • Human resources (FTEs returned to home units, departures of contracted resources) • Information management - describe where the documents have been stored or archived, using

a table format such as the following 45 BILLING PROCEDURE At, both QS and sub-contracting works are done a common dept. There is a cost control and budgeting dept on next desk to this department and simultaneously, co-ordination between both of them is done for carrying out works. Payment is usually carried out on 8th date of every month. TYPES OF BILLS:  Advance Bills  Monthly RA (Running Account) BillEscalation Bills SUBMITTED BY: BHUMIKA RAJ UC5316

178


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Figure 83: Closure Of Project Flowchart

1min
page 194

Figure 81: Manpower Status0

0
page 190

Figure 72: Contents Of Mpr

5min
pages 183-185

Figure 71: Weekly Details

2min
page 182

Table 40: Characteristics Detail

1min
page 155

Figure 70: Billing Flowcart

1min
pages 180-181

Table 45: Format Of Snag List

1min
pages 178-179

Figure 62: Segments Location

1min
page 152

Figure 61: Tmt Bars Location

2min
pages 148-149

Figure 55: Codification Example

1min
page 135

Figure 40: Project Package Details

1min
page 74

Figure 31: Flow Chart For Labour License

4min
pages 86-87

Table 30: Cash Outflow

1min
page 78

Table 24: Cost Estimate

2min
page 71

Figure 54: Softwares Used

4min
pages 133-134

Table 32: Cash Outflow For Year 2016-2017

0
page 120

Figure 37: Work Schedule Format

2min
page 64

Table 14: International Protocols

1min
page 62

Figure 11:Mumbai Metro Network

1min
page 36

Table 2: List Of Projects

1min
page 21

Table 11: Funding Pattern Break Up

4min
pages 46-49

Figure 5: Alignment Of Passengers In Suburban Rail

3min
pages 28-29

Figure 13: Funding Breakup

1min
page 43

Figure 14:Flowchart Showing The Formation Of Insititutional Framework By Goi For Carrying Out Approvals

3min
pages 52-53

Figure 33: Bid Document Details

3min
pages 50-51
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.