Project Cycle Report: Infrastructure Project

Page 194

MUMBAI METRO LINE 3 

Project planning, for example, remains uncoordinated between the office and the field and is often done on paper. Contracts do not include incentives for risk sharing and innovation; performance management is inadequate, and supply-chain practices are still unsophisticated. The industry has not yet embraced new digital technologies that need up-front investment, even if the long-term benefits are significant (Exhibit 3). R&D spending in construction runs well behind that of other industries: less than 1 percent of revenues, versus 3.5 to 4.5 percent for the auto and aerospace sectors. This is also true for spending on information technology, which accounts for less than 1 percent of revenues for construction, even though a number of new software solutions have been developed for the industry65

process digitization means moving away from paper and toward online, real-time sharing of information to ensure transparency and collaboration, timely progress and risk assessment, quality control, and, eventually, better and more reliable outcomes66 48.2 AREAS FOR REPORTING IN CONSTRUCTION OF METRO

One reason for the industry’s poor productivity record is that it still relies mainly on paper to manage its processes and deliverables such as blueprints, design drawings, procurement and supply-chain orders, Figure 77: covid -19 fightback

equipment logs, daily progress reports, and punch lists. Due to the lack of digitization, information sharing is delayed and may not be universal. Owners and contractors therefore often work from different versions of reality. The use of paper makes it difficult to capture and analyze data; that matters because in procurement and contracting, historical performance analytics can lead to better outcomes and risk management

.

65

https://www.mckinsey.com/industries/capital-projects-and-infrastructure/our-insights/imaginingconstructions-digital-future

SUBMITTED BY: BHUMIKA RAJ UC5316

190


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Figure 83: Closure Of Project Flowchart

1min
page 194

Figure 81: Manpower Status0

0
page 190

Figure 72: Contents Of Mpr

5min
pages 183-185

Figure 71: Weekly Details

2min
page 182

Table 40: Characteristics Detail

1min
page 155

Figure 70: Billing Flowcart

1min
pages 180-181

Table 45: Format Of Snag List

1min
pages 178-179

Figure 62: Segments Location

1min
page 152

Figure 61: Tmt Bars Location

2min
pages 148-149

Figure 55: Codification Example

1min
page 135

Figure 40: Project Package Details

1min
page 74

Figure 31: Flow Chart For Labour License

4min
pages 86-87

Table 30: Cash Outflow

1min
page 78

Table 24: Cost Estimate

2min
page 71

Figure 54: Softwares Used

4min
pages 133-134

Table 32: Cash Outflow For Year 2016-2017

0
page 120

Figure 37: Work Schedule Format

2min
page 64

Table 14: International Protocols

1min
page 62

Figure 11:Mumbai Metro Network

1min
page 36

Table 2: List Of Projects

1min
page 21

Table 11: Funding Pattern Break Up

4min
pages 46-49

Figure 5: Alignment Of Passengers In Suburban Rail

3min
pages 28-29

Figure 13: Funding Breakup

1min
page 43

Figure 14:Flowchart Showing The Formation Of Insititutional Framework By Goi For Carrying Out Approvals

3min
pages 52-53

Figure 33: Bid Document Details

3min
pages 50-51
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.