Project Cycle Report: Infrastructure Project

Page 21

MUMBAI METRO LINE 3

3

FORMATION OF MMRC

INNOVATION, CAPACITY BUILDING AND GENERAL SUPERVISION - FORMATION OF NATIONAL URBAN RAIL TRANSIT CORPORATION (NURTC) All the metro rail projects are to be covered under the Metro Railways (Construction of Works) Act, 1978 and the Metro Railways (Operations and Maintenance) Act, 2002. However, the present Acts need some amendments to bring more specific provisions regarding PPP projects and also to empower State Governments within the ambit of the Constitution. It was suggested the Central Government should form NURTC to assist the State Governments in realizing their MRTS schemes. NURTC could take over such projects on a turnkey basis on deposit terms or function as General Consultants to the Special Purpose Vehicles which will be set up by the State Government for implementing and operating the MRTS project. Wherever the State Governments wish to employ International Consultants, NURTC should be engaged as Prime Consultants to safeguard the interest of the State Government and the Central Government. Thus MMRC was formed:To justify the above statement flowing chart is prepared :

Project name

Nature

MUMBAI METRO LINE 3

UNDERGROUND.

Setting Up of Special Purpose Vehicle (SPV) (2011,Detailed Project Report for Through Metro Corridor: Colaba – Bandra –SEEPZ)Final Report November, 2011 13‐2 Formation :An SPV named MMRC (Mumbai Metro Rail Corporation Ltd.) was incorporated on 30.4.2008 with the mandate “To establish, Operate and Maintain Guided Urban Transit Systems in and around Mumbai City so as to meet the urban transport needs of Mumbai”. Role :Vehicle (SPV), vested with adequate powers, is an effective organizational arrangement to implement and subsequently operate and maintain a metro rail project mumbai urban transport policy 2 -MMRDA is the governing body

MMRC (appointed by MMRDA) as per suggestion by Central Government in 12th five year developemnt plan.

Mumbai Metro L ine 3(MMRC)

WORK PAKAGES (17Awarded to different contrators) Figure 2:body organisation

SUBMITTED BY: BHUMIKA RAJ UC5316

20


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Figure 83: Closure Of Project Flowchart

1min
page 194

Figure 81: Manpower Status0

0
page 190

Figure 72: Contents Of Mpr

5min
pages 183-185

Figure 71: Weekly Details

2min
page 182

Table 40: Characteristics Detail

1min
page 155

Figure 70: Billing Flowcart

1min
pages 180-181

Table 45: Format Of Snag List

1min
pages 178-179

Figure 62: Segments Location

1min
page 152

Figure 61: Tmt Bars Location

2min
pages 148-149

Figure 55: Codification Example

1min
page 135

Figure 40: Project Package Details

1min
page 74

Figure 31: Flow Chart For Labour License

4min
pages 86-87

Table 30: Cash Outflow

1min
page 78

Table 24: Cost Estimate

2min
page 71

Figure 54: Softwares Used

4min
pages 133-134

Table 32: Cash Outflow For Year 2016-2017

0
page 120

Figure 37: Work Schedule Format

2min
page 64

Table 14: International Protocols

1min
page 62

Figure 11:Mumbai Metro Network

1min
page 36

Table 2: List Of Projects

1min
page 21

Table 11: Funding Pattern Break Up

4min
pages 46-49

Figure 5: Alignment Of Passengers In Suburban Rail

3min
pages 28-29

Figure 13: Funding Breakup

1min
page 43

Figure 14:Flowchart Showing The Formation Of Insititutional Framework By Goi For Carrying Out Approvals

3min
pages 52-53

Figure 33: Bid Document Details

3min
pages 50-51
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.