Project Cycle Report: Infrastructure Project

Page 43

MUMBAI METRO LINE 3

9

FOREGIN COLLABARATION –EXTERNAL AID 9

Project Implementation System 1)Borrower: President of India 2) Guarantor: None 3) Executing Agency:Mumbai Metro Rail Corporation Limited: MMRCL 4) Operation and Maintenance System: The maintenance/management after the completion of the project is to be performed directly by the MMRCL

Table 10: JAPAN FUNDING MODEL

9.1.1

BILATERAL ASSISTANCE

Official Development Assistance, ODA, is undertaken by governments or government agencies to promote economic development and welfare in emerging countries. Since 1954, Japan has been providing financial and technical assistance through ODA, and the features of Japanese ODA have been promotion of self-help, sustainable economic growth and human security in emerging countries. ODA loans support emerging countries providing low-interest, long-term and concessional funds to finance their development efforts. ODA loans are normally used for large-scale infrastructure and other forms of development that require substantial funds. ODA loans, which require repayment, promote efficient use of the borrowed funds and appropriate supervision of the project they finance, thereby underpinning emerging countries’ ownership in the development process (Jica guidelines for Asian countries, n.d.).

9

Official jics guidelines , SUBMITTED BY: BHUMIKA RAJ UC5316

42


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Figure 83: Closure Of Project Flowchart

1min
page 194

Figure 81: Manpower Status0

0
page 190

Figure 72: Contents Of Mpr

5min
pages 183-185

Figure 71: Weekly Details

2min
page 182

Table 40: Characteristics Detail

1min
page 155

Figure 70: Billing Flowcart

1min
pages 180-181

Table 45: Format Of Snag List

1min
pages 178-179

Figure 62: Segments Location

1min
page 152

Figure 61: Tmt Bars Location

2min
pages 148-149

Figure 55: Codification Example

1min
page 135

Figure 40: Project Package Details

1min
page 74

Figure 31: Flow Chart For Labour License

4min
pages 86-87

Table 30: Cash Outflow

1min
page 78

Table 24: Cost Estimate

2min
page 71

Figure 54: Softwares Used

4min
pages 133-134

Table 32: Cash Outflow For Year 2016-2017

0
page 120

Figure 37: Work Schedule Format

2min
page 64

Table 14: International Protocols

1min
page 62

Figure 11:Mumbai Metro Network

1min
page 36

Table 2: List Of Projects

1min
page 21

Table 11: Funding Pattern Break Up

4min
pages 46-49

Figure 5: Alignment Of Passengers In Suburban Rail

3min
pages 28-29

Figure 13: Funding Breakup

1min
page 43

Figure 14:Flowchart Showing The Formation Of Insititutional Framework By Goi For Carrying Out Approvals

3min
pages 52-53

Figure 33: Bid Document Details

3min
pages 50-51
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.