Energy & Commerce Edición 43 Marzo 2021

Page 78

30 sep. - 03 oct. Monterrey, 2020 30 sep. - 03 oct. Monterrey, 2020

Control selectivo de agua en yacimientos naturalmente fracturados Esta tecnología se adecua al tipo de agua de formación en el laboratorio. Así, los ingenieros afirman que posible prolongar el periodo productivo en los pozos que actualmente funcionan con alto corte de agua Por / By : Miguel Aguilar, Ricardo Posadas, Jaime Ríos, Roberto Lagunas, Eduardo Gaytán y Juan Treviño

L

os ingenieros Aguilar, Posadas, Ríos, Lagunas, Gaytán y Treviño elaboraron una propuesta para el control selectivo de agua de formación en yacimientos naturalmente fracturados en condiciones de alta presión y temperatura. La explotación de los yacimientos petroleros tiene varias etapas de producción. De inicio, es común perforar pozos que producen de manera natural. En esa etapa los ingenieros perforan, al tiempo que la producción se estabiliza mediante bajos costos y factores de recuperación (FR) que van del 5% al 20%. Sin embargo, la producción declina debido a la perdida de presión del yacimiento. En esa segunda etapa es necesario utilizar alguna tecnología que permita mantener su energía para incrementar el FR de 20% a 45%. La tercera etapa implica altos costos para incrementar la producción y el FR de 45% a 65%. Los especialistas evaluaron un campo ubicado en Cd. del Carmen, Campeche. El yacimiento recibió una inyección de nitrógeno como mantenimiento de presión en su segunda etapa de producción. Previamente había sido sujeto a terminaciones no convencionales en agujero descubierto con cola extendida, pozos horizontales, tecnologías para control de gas y agua, así como sensores en la ventana de aceite. El estudio pretendió administrar la declinación de la producción e incrementarla hasta lograr un factor de recuperación del 42% (FR). Debido a los bajos precios del petróleo, restructuración del personal y a la prioridad de otros proyectos en los últimos 3 años, la implementación de nuevas tecnologías ha estado detenida por los costos y riesgos, particularmente en el caso de las tecnologías para control de agua. En la actualidad este problema continúa. El contacto agua aceite (CAA) avanza y algunos pozos que anteriormente no presentaban un alto corte de agua (%WC) actualmente tienen 90% y 100% de WC. Por ello, los ingenieros elaboraron una propuesta técnica-económica de dos pozos con problemas de canalización de agua. En su estudio, utilizaron el pozo Ejemplo-3083 para aplicar la última tecnología de control de agua con gel selectivo, probada con anterioridad en los campos Copano y Xanap. Los ingenieros concluyeron que ambos pozos eran candidatos a un control de agua selectivo. Su objetivo era obturar canales preferenciales de agua de formación (canalización), así como disminuir la

78

Selective water control in naturally fractured reservoirs This technology is suitable for any type of formation water in laboratories. Thus, the engineers affirm that it is possible to extend the productive period in oil wells that currently operate with high water cut-off.

E

ngineers Aguilar, Posadas, Ríos, Lagunas, Gaytán, and Treviño developed a proposal for the selective control of formation water in naturally fractured reservoirs under conditions of high pressure and temperature. The exploitation of oil fields has several stages of production. Initially, it is common to drill wells that produce naturally. At this stage, engineers drill, while production is stabilized by low costs and recovery factors (RF) ranging from 5% to 20%. However, production declines due to the loss of pressure in reservoirs. In this stage, it is necessary to use technologies that allow it to maintain its energy and increase the RF from 20% to 45%. The third stage implies higher costs to increase production and the RF from 45% to 65%. Specialists evaluated a field located in Cd. Del Carmen, Campeche. The field received a pressure maintenance injection of nitrogen in its second stage of production. It had previously been subjected to unconventional open hole completions with an extended tail, horizontal wells, technologies for gas and water control, as well as sensors in the oil window. The study aimed to manage the decline in production and increase it until a recovery factor of 42% (RF) was achieved. Due to low oil prices, personnel restructuring, and the priority of other projects in the last 3 years, the implementation of new technologies has been halted by costs and risks, particularly in the case of water control technologies. Today this problem continues. The oil-water contact (OWC) advances and some oil wells that previously did not present a high water cut (% WC) currently have 90% and 100% WC. Therefore, the engineers prepared a technical-economic proposal for two wells with water


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Control selectivo de

6min
pages 78-79

Análisis de riesgo con

3min
pages 80-81

Geoingeniería para

4min
pages 76-77

Características intrusivas

4min
pages 74-75

Reducción de incertidumbre

4min
pages 70-71

Datos sísmicos

4min
pages 68-69

Identificación de

3min
pages 72-73

Discretización de

3min
pages 66-67

Tipificación de rocas

3min
pages 64-65

Soluciones analíticas

3min
pages 62-63

Potencial de crecimiento de

7min
pages 58-61

Ciberseguridad, el blindaje en

5min
pages 54-55

Crisis energética en Texas impulsa demanda

3min
pages 56-57

Eloy Ávila

5min
pages 52-53

Eduardo Silva

6min
pages 50-51

Isaías Vitela

4min
pages 48-49

Alejandro Desfassiaux

3min
pages 46-47

Carlos García

5min
pages 42-43

Radiografía de la industria de

6min
pages 38-41

Laboratorio acreditado 17025?

4min
pages 36-37

María Pilar

7min
pages 28-31

COPIISA OFFSHORE refrenda su compromiso

2min
page 34

Campos terrestres, plataforma

6min
pages 32-33

Pemex, contra todas las apuestas

16min
pages 21-27

Noé Sáenz

2min
page 35

El delicado equilibrio entre la

7min
pages 18-20

Sustentabilidad y crecimiento

3min
pages 16-17

Tratados comerciales y reforma eléctrica

2min
page 12

Parlamento Abierto sobre

3min
page 10

83 aniversario de la

3min
page 15

El hampa acecha a la industria

5min
page 13

Impulso a la industria en un contexto de cambio

3min
page 8

Excelencia y meritocracia: valores

4min
page 14

El mejor aprovechamiento de los recursos de la nación

3min
page 9
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.