Industry Europe – Issue 24.8

Page 48

standards and are given the same degree of expertise and priority whether they are for just one individual window or a major project.

Focus on the UK market Germany remains the company’s biggest European market but it has also been involved in some of the UK’s most prestigious and innovative projects in the recent past. This has led to the strategic decision to build upon its reputation in the UK and establish a sales office there in the near future. One of the recent high-profile UK projects was its involvement in the building of Birmingham’s most distinctive modern façade, that of the commercial building known as ‘The Cube’. This 23-storey city centre land-mark building was completed in 2010 at a cost of more than £100 million and was designed by Ken

46 Industry Europe

Shuttleworth, the architect renowned for his design of the ‘Gherkin’ in the city of London’s financial district. Haepp said, “The Birmingham ‘Cube’ project was a major UK contract for us where we worked in close collaboration with a German systems supplier for our extrusions. We specialise in contracts which can range up to €20 million and this one was close to €15 million, although many of our projects range between €500,000 and €5 million. Our company is also unique in that we are happy to produce individual, one-off items too such as special doors, windows and canopies. “The UK is an attractive market for us and the construction industry is now seeing signs of strong growth in the sectors in which we specialise, which includes residential, industrial and government projects such

as municipal buildings, schools and hospitals. We pride ourselves on the breadth of services we offer. These result in our clients getting better engineering standards and the most efficient installation, which can also mean the shortest installation periods. “Another unique aspect of our work is the fact that because of our diverse steel fabrication facilities and expertise, we have an interface between primary steel and glass. These two elements have very different tolerances and normally a contractor will retain two separate companies to manage each element. We are unique in that we manage both and have all the facilities under one roof. We also have our own highly qualified engineering department and installation teams which are dedicated to each individual project so that we maintain overall control of the schedule


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Experts in locking systems RST Roztocze

12min
pages 126-136

Partner in polymer solutions Nolato Medical

6min
pages 122-125

Polymer production solutions Mikrosan

4min
pages 119-121

The 3D printing revolution Materialise

11min
pages 112-118

A new leader in surface solutions Oerlikon Balzers

9min
pages 100-103

Diversity in metals Zucchetti Mario Forging

4min
pages 104-107

Experts in technical labels Gravic Hungary

7min
pages 108-111

Continuous improvement is the key to quality castings SCM Foundries

4min
pages 97-99

Celebrating 40 years of high technology Fidia

10min
pages 92-96

Pressure for perfection Avure

11min
pages 88-91

New focus for engineered hose specialist

5min
pages 85-87

Exports drive growth Podgorje

4min
pages 82-84

Harnessing wind power Norvento

5min
pages 68-71

Investing to meet rising demand Pick Szeged

5min
pages 78-81

Delivering intelligent energy solutions Standardkessel

6min
pages 72-77

Cleaner and greener Tennant Company

5min
pages 60-63

Transforming power efficiency Kolektor Etra

6min
pages 64-67

Number one in flooring solutions HTC Group

7min
pages 56-59

Seeking new markets Siplast

6min
pages 48-51

Unrivalled agrochemical expertise SKW Piesteritz

5min
pages 52-55

Success cubed Haga Metallbau

5min
pages 44-47

Intelligent light systems Automotive Lighting

6min
pages 38-40

Experts in construction chemicals KREISEL

7min
pages 41-43

Experts in assembling automotive parts

3min
pages 29-33

Excellence rewarded Daimler

8min
pages 34-37

Focus on Germany Allan Hall reports from Berlin

3min
page 22

Technology spotlight Advances in technology

3min
page 20

Power from the sea Alderney tidal array

8min
pages 12-13

Linking up Combining strengths

7min
pages 16-17

Moving on Relocations and expansions

3min
page 18

Industry people Appointments

3min
page 19

Winning business New orders and contracts

4min
pages 14-15

Notice board New products and processes

2min
page 21

Europe’s shipbuilding industry competes

6min
pages 6-8
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.