Landscape Site Grading Principles

Page 254

ground, then slope the landscape, walks, plazas, and driveways so that surface water drains down and away from the building. Figure 14.6 shows this approach very well. The ground and paved areas around the building are set at elevations below the first-floor elevation and sloped to direct water away from the building entrances and the structure itself. The paved areas and ground adjacent to the building are more gently sloping, with slopes farther away from the building becoming relatively steeper.

Contour Grading One of the simplest and most direct ways of directing water away from a building is to elevate the structure and surrounding area, then create a slope that will direct surface water to drain away to an area designed to receive the excess water. The grass slope in the photograph in Figure 14.7 was created to do just that. In this example, the surface water is directed downhill to an extensive planting bed that receives the water, allowing it to soak into the soil. Any excess water moves farther downhill into the dense tree cover and landscape understory. Surface water is directed to either side of the lawn area shown in Figure 14.8A. An underground storm water collection system has been installed along either side of the lawn in the form of catch basins. Look carefully at the picture in Figure 14.8-B, and you will be able to see a crease in the walk that represents the top of the crown that runs along the center of the space. The slopes shown in Figure 14.9 conform to a series of terraces created to absorb runoff from the walkways before Figure 14.7  Simple slope to drain water away from it reaches the soccer field below. The building

236

Landscape Site Grading Principles


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Index

8min
pages 316-322

References

0
page 315

Introduction to Estimating Earth-Moving Quantities

3min
pages 277-278

Water Detention Swale

4min
pages 268-270

Cut and Fill Is the Process of Earth Moving

2min
pages 275-276

Water Management

1min
pages 273-274

Aquifer Recharge

2min
pages 264-265

Retention Ponds

2min
pages 266-267

Roadside Drainage Swale

1min
page 263

Contour Grading

3min
pages 254-256

Traditional Handling of Surface Storm Water

1min
page 253

Design Process for Grading a Pedestrian Ramp

3min
pages 231-232

Construction Sequence for a Bus Shelter

4min
pages 245-248

Introduction

5min
pages 249-252

Introduction

1min
page 229

Grading of Paved Surfaces: Walks and Ramps

1min
page 230

Creating a Sculpted Landform

2min
pages 218-220

Catch Basin Design in Paved Area

1min
page 217

Creating a Watershed to Collect Surface Water

1min
page 216

Creating Landscapes Using Contours

3min
pages 182-183

Introduction

1min
page 203

Creating a Level Area on Sloping Ground

1min
page 206

From Schematic Design Plan to Grading Plan

2min
pages 178-181

How a Contractor Uses Spot Elevations Shown on a Grading Plan

1min
page 177

Introducing Calculation of Slope

3min
pages 138-139

Putting It All Together

3min
pages 134-137

Slope in Plan and Section

5min
pages 122-126

Contour Lines: A Language for Two Dimensions

1min
page 111

Reading the Landscape

1min
page 110

Introduction

1min
page 109

Referencing System for a Land Parcel

1min
page 104

The Language of Maps How to Find and Locate Places in the Landscape,

1min
page 95

Licensed Land Surveyor

1min
page 105

U.S. Geological Survey and Scales of Other Countries

2min
pages 93-94

The Information Contained in Topographic Maps

1min
page 92

Architect’s and Engineer’s Scales

1min
page 86

Topographic Maps Are Useful Preplanning Tools

4min
pages 87-89

Map Scales and Contour Intervals

2min
page 90

Using and Choosing the Right Scale

2min
page 83

Reference Plan and Match Lines

2min
pages 84-85

Site Grading Is Integral to the Phases of Design

1min
page 82

The Need for Scaled Drawings

1min
page 81

Scale: A Word of Several Meanings

2min
pages 79-80

Construction Documentation

1min
page 75

Miscommunication

1min
page 74

Another Word about Scale

2min
pages 76-78

Drafting and Representation The Concept of Documentation Conventions in

1min
page 69

Music and Design Following Drawing Conventions Prevents

4min
pages 70-73

Drawing Conventions: Landscape Drawings and Music Scores

1min
pages 67-68

the Design Continuum

1min
pages 65-66

Preliminary Site Grading Plan Design Development and Subsequent Phases in

2min
pages 63-64

Step 4 Land Use and Circulation Diagram

1min
pages 56-57

Step 3 Program Analysis

2min
pages 54-55

Introduction

1min
page 45

Professional Registration to Practice Landscape Architecture

5min
pages 40-44

Site Grading in the Professional Practice of Landscape Architecture

1min
page 39

Could Have Been Avoided

1min
pages 37-38

Avoiding Grading Problems in the Landscape

1min
page 36

What the Student Needs to Know about Site Grading

4min
pages 27-29

The Importance of Grading in Design

3min
pages 22-23

Site Grading Informs Design

2min
pages 19-20

Professional Relationships

1min
page 30

Let’s Begin

0
page 21

A Picture Is Worth a Thousand Words

1min
page 24

What Is Site Grading?

2min
pages 33-35

The Basic Structural Approach to This Book

1min
pages 31-32
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.