Alcantara, M.N.P.A definition of the time frame and priorities have not been displayed. Additional meticulous results have been presented in the next subsections, indicating the 32 SUMP Activities that have been covered (25), partially covered (5), and also specifying the ones that are unclear (2).
Figure 60.
4.4.1. Phase 1 | Preparation & Analysis PUMS has presented its development process throughout the document and shared the details right after the introduction
in part
(in English, Plan structuring and participation process). Hence, the steps from the SUMP cycle Phase 1 (Preparation and Analysis) have been explored in the analyses beneath. Step 1 - set up working structures: PUMS has been led by Direttore del Dipartimento Mobilità e Trasporti, the regional public mobility authority. Moreover, the plan has thrived on engaging citizens, stakeholders, regional and municipal representatives, public transport operators, experts, mobility professionals, and other department members. For instance, PUMS has addressed the citizens as the main actors, who, in (in English, the consultation phase), had already the opportunity to give Sustainable Urban Mobility Plans [SUMPs] and the transition behind planning paradigms 99