Alcantara, M.N.P.A 4.4.3. Phase 3 | Measure Planning PUMS has presented its measuring plan as part of Volume II through many different chapters. Thus, the steps from the SUMP cycle Phase 3 (Measure Planning) have been presented in the analyses beneath. Step 7
select measure packages with stakeholders: PUMS has mentioned that the
development of collective mobility is essential. In addition, PUMS has defined (in English, Universal Accessibility) as the unifying concept for its strategic vision (Figure 63 that has been exposed along the listening phase. Furthermore, PUMS aims to create conditions for full compliance
as broad as possible
toward the right to accessibility.
Figure 63. Universal Accessibility, the unifying concept of PUMS. Source: Roma Servizi per la Mobilità (2019b)
As a result, the measure packages supported by the SUMP guidelines have been based on themes presented in Figure 63, reinforcing the necessity for more integrated approaches, as supported by the SUMP guidelines, to overcome current and future mobility challenges. Step 8
agree actions and responsibilities: PUMS has described all actions throughout azioni del p
(in English, Environmental report annex