Alcantara, M.N.P.A
Figure 37. Overview of Vienna STEP UMP s Phase 2 analyses. Source: Author
Thus, even completing the second phase milestone cycle
reaching the middle of the SUMP
this open target could compromise the monitoring progress (Phase 4) since it is
unclear how much the plan expects to achieve. For instance, if it rises or declines just a little, it could be considered to have reached its goals, even if that would not mean much progress. Hence, this could be a point to be improved for the following plans. 4.1.3. Phase 3 | Measure Planning The STEP UMP has presented its measuring plan mainly in the second part, divided into nine chapters,
Space:
Organization lity n Furthermore, as earlier stated in Chapter 2 (Figure 4), the SUMP cycle Phase 3, Measure Planning, also has three steps, which summary analyses results have been shown below. Step 7
select measure packages with stakeholders: STEP UMP has not shared much
information regarding the assessment of long lists of measures by the SUMP guidelines
recommended activity
that possibly have been done before the selection of the 50
ones presented in the document. Nevertheless, it does not mean that this activity did not occur, but rather that it might not have been published in the final paper since some lists of measures have not been selected for the shortlist
a similar assumption to Step 4.
Although, it is essential to highlight that according to Figure 35, stakeholders have been very involved in the measures process, which is a positive outcome for this step. Sustainable Urban Mobility Plans [SUMPs] and the transition behind planning paradigms 59