Alcantara, M.N.P.A Convergence Phase) to guarantee their operability areas
especially in the cross-cutting
and also provide transparency around the planned actions, which also contributes
to assuring political and public support, as suggested by the SUMP guidelines. Step 9 prepare for adoption and financing: GM has allocated budget information in each action, apart from also presenting a chapter dedicated to budgetary information, which is called
(in English, Budgetary
and human resources reflecting the ambitions). This chapter has explained some technical information regarding budgetary reallocations and funding sources. In addition, it has also shared the main budgets regarding the settlements from 2017. Further, to conclude this Step and ensure t
the (in English, The Public Inquiry) about the draft document that
happened for four months in 2019. Moreover, an extensive communication system has been organized with presentations, press articles, poster campaigns, social media, temporary exhibitions, and emblematic events. In the end, there were a total of 40 meetings, including 22 at the core of the municipalities, which enabled participants to discuss the draft plan directly. Thence, the last activity has also been successful, and Figure 47 compiles the GM analyses from SUMP Cycle Phase 3, where all activities have been covered.
Figure 47. Overview of Brussels
Phase 3 analyses. Source: Author
Sustainable Urban Mobility Plans [SUMPs] and the transition behind planning paradigms 77